Integral rapid construction method for earthwork, ground mould and pile of manhole pile multi-pile cap
A construction method and technology of pile cap, which are applied in excavation, sheet pile wall, foundation structure engineering, etc., can solve the problems of waste of resources, recovery again, and large amount of engineering, so as to speed up the construction process of earthwork, reduce waste of resources, The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] Such as figure 1 , 2 , 3, before carrying out the multi-pile cap construction of manhole piles in the prior art, the earthwork construction is carried out in the foundation pit 111 first, and the pile construction operation surface 101 that meets the predetermined manhole pile construction is constructed, such as figure 2 As shown, at this time, it is often not distinguished whether the pile is an inner pile of the cap or an outer pile of the cap. Re-division or overall laying out, after the line inspection confirms the position of the pile, the pile construction will be carried out, including digging the earthwork in the pile, carrying out the construction of the pile retaining wall 104, binding the pile core reinforcement, pouring the pile core concrete 103 and performing the maintenance of the pile core concrete . After the construction of the inner and outer piles of the cap is completed, the pile construction team withdraws and the structure construction team en...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 