Engineering change charge monitoring system and method

A technology of engineering change and monitoring system, which is applied in the direction of data processing applications, instruments, resources, etc., can solve the problems of affecting the progress of the construction period, the signing of the change cost is out of control, and the inability to grasp the change cost in a timely and proactive manner, so as to improve work efficiency and reduce Management costs, reducing the effect of the approval process

Inactive Publication Date: 2008-09-24
施兆洲
View PDF0 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The change fee signing bills are often kept by the contractor and the issuing personnel separately. The owner's internal supervision department can only passively wait for these change fee signing bills to be submitted, but cannot promptly and proactively grasp the status of the change fee issued, which brings great risks to the owner.
For example, the on-site representative or the professional consultant entrusted by the owner may not report to the owner's internal supervision department in a timely manner after issuing the change cost signing slip, and the change cost signing slips obtained by the contractor may accumulate, and they will collect the change cost from the owner when the project is completed , resulting in the change fee signing out of control
There are also some construction project owners who require the change fee signing procedures to be approved by circulation. The construction site representatives will first review the project change fee signing documents, and then submit them to the owner's upper management department for approval or entrust professional consultants for review. The role of risk, but due to the circulation and approval of written documents, work efficiency is low, management costs are high, and sometimes it even affects the progress of the construction period
[0003] In addition, the change fee cannot be automatically counted. When the owner wants to know the change fee every time, he must collect the change sign, and then make a statistical analysis. The statistical data may also be incomplete due to the incomplete collection of the change sign
[0004] With the development of IT technology, some construction project owners use office automation (OA) systems to improve management efficiency, but at present these OA systems can only be used for internal office process management of owners, not suitable for coordinating contractors, professional consultants and owners, etc. The monitoring process of reporting and reviewing change fees between different stakeholders

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering change charge monitoring system and method
  • Engineering change charge monitoring system and method
  • Engineering change charge monitoring system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] Embodiment 1 is a preferred embodiment of the present invention based on browser / server structure (B / S structure).

[0033] refer to figure 1 , the engineering change cost monitoring system of the present embodiment 1 includes a declaration terminal 101, an audit terminal 102, a monitoring terminal 103, a server 104 and a computer network 105, and the declaration terminal 101, the audit terminal 102 and the monitoring terminal 103 are all A computer equipped with a general-purpose web browser and connected to the computer network 105. for your convenience, figure 1 Only one declaration terminal, one audit terminal and one monitoring terminal are shown in the figure, but the number of declaration terminals, audit terminals and monitoring terminals can be expanded arbitrarily according to actual needs, and their respective hardware and software configurations can be completely the same or different. same.

[0034] The server 104 is a computer running general HTTP servi...

Embodiment 2

[0067] The second embodiment is another embodiment of the present invention based on the client / server structure (C / S structure).

[0068] refer to Figure 7 The project change cost monitoring system in the second embodiment includes a declaration terminal 710, an audit terminal 720, a monitoring terminal 730, a server 700, and a computer network 740, the declaration terminal 710, the audit terminal 720, the monitoring terminal 730 and all The servers 700 are respectively connected to the computer network 740. for your convenience, Figure 7 Only one declaration terminal, one audit terminal and one monitoring terminal are shown in the figure, but the number of declaration terminals, audit terminals and monitoring terminals can be expanded arbitrarily according to actual needs, and their respective hardware and software configurations can be completely the same or different. same.

[0069] The server 700 is a computer installed with a server module 701 and a database 702, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an engineering changing cost dynamic monitoring system and a method thereof. The dynamic monitoring system and a method comprise the following steps: changing cost information data are sent to a server by a declaration terminal through computer network. The changing cost information data are downloaded by an audit terminal. The audit information data after being audited are uploaded to the server. A monitoring terminal downloads the audit information data from the server to generate a statistical report. All signing data of the changing cost and audit process data are stored in the data storing device of the server, the changing cost statistical report can be examined at any time through the monitoring terminal to actively master the fee condition of changing signing and realize the dynamic monitoring the engineering cost changing.

Description

technical field [0001] The invention relates to a system and method for managing construction project change costs, in particular to a system and method for implementing dynamic monitoring of construction project change costs through a computer network. Background technique [0002] The project change fee signing during the construction process of the construction project is a legal document. Generally, the contractor submits written declaration materials, and then the construction site representative authorized by the owner or the professional consultant entrusted by the owner reviews and signs the document for confirmation. The change fee signing bills are often kept by the contractor and the issuing personnel separately. The owner's internal supervision department can only passively wait for these change fee signing bills to be submitted, but cannot promptly and proactively grasp the status of the change fee issued, which brings great risks to the owner. . For example, t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/00G06Q50/00G06Q10/06
Inventor (请求不公开姓名)
Owner 施兆洲
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products