Extrusion pile-forming method of belled prefabricated pile body with high bearing ability
A bearing capacity and pile forming technology, applied in sheet pile wall, construction, infrastructure engineering and other directions, can solve the problems of difficult quality assurance, large loss end bearing capacity, bearing capacity attenuation, etc., to achieve high strength utilization, single pile The effect of high carrying capacity and cost reduction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] As shown in Fig. 1a-Fig. 1e, the extrusion pile method of the expanded bottom prefabricated pile body with high bearing capacity of the present invention comprises the following process steps:
[0018] a. Sink the immersed tube 2 with the metal pile head 1 into the design elevation of the hard soil layer; b. Take out the metal pile head; c. Expand the bottom with extrusion equipment to form the lower base space 1, and pull up the immersed tube 2 to the set value For the distance H, the upper base space 3 is formed by expanding the bottom with extrusion equipment, and the broken soil is sucked up with soil suction equipment; d, the lower prefabricated hollow pile body 5 with the inserted rib 7 at the lower end is connected with the upper prefabricated hollow pile body 4 through the steel bar 6 Then lower down from the sinking tube 2 until it is in place; e, pour concrete from the middle hole of the pile body, and pour the lower and upper bases; f, pull out the sinking tub...
Embodiment 2
[0020] Steps a to c are the same as in Example 1. As shown in Figure 2, process d pours concrete into the lower base from the sinking tube mouth; process e connects the lower prefabricated solid pile body 8 with the inserted rib 7 at the lower end to the upper prefabricated hollow pile 4 through the steel bar 6 and inserts it into the sinking tube 2 Until it is in place, pour the base; process f pulls out the immersed tube 2, and injects cement slurry into the gap.
[0021] The set distance H described in Embodiment 1 and Embodiment 2 is 2-10 times the diameter of the base.
[0022] The extrusion equipment in process c described in Embodiment 1 and Embodiment 2 is a hydraulic support disc forming machine. The specific steps of absorbing the broken soil in the operation c described in the embodiment 1 and the embodiment 2 are as follows: take the soil with the air suction soil equipment, and when there is only a small amount of loose soil in the base, pour water from the mouth...