Full automatic standard apparatus for electric energy meter
A standard device, energy meter technology, applied in the direction of measuring devices, measuring electrical variables, instruments, etc., can solve the problems of lack of effective detection methods for electrical connection reliability, damage to the energy meter device, and high labor intensity, to meet the needs of high current Verification/testing, changing time-consuming, reducing labor-intensive effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] This embodiment is a fully automatic standard device for an electric energy meter, as shown in Figures 1 to 8, including a main frame 3, two rails 33 are installed in parallel on the top of the main frame, and two sides of the central part of the main frame 3 are respectively installed with error processing for electric energy meters Module 31 and electric energy meter voltage and current output module 32. One end of the main frame 3 is equipped with an electric energy meter verification buffer band 34, and both ends of the main frame 3 are equipped with a loading manipulator 35 and a discharging manipulator 36; on the two rails 33 respectively A movable infrared temperature measuring probe 40 and a liquid crystal recognition probe 37 are installed; a sliding rail 41 is installed in the middle of the main frame 3, and a transfer trolley 38 is installed on the sliding rail 41; two rails 33 are respectively installed with movable translational grasping robots 39; The main f...
Embodiment 2
[0040] This embodiment is a fully automatic standard device for an electric energy meter, as shown in Figures 1 to 6, and Figures 9 to 11, including a main frame 3. Two rails 33 are installed on the top of the main frame 3 in parallel, on both sides of the main frame 3 The error processing module 31 of the electric energy meter and the voltage and current output module 32 of the electric energy meter are respectively installed. One end of the main frame 3 is equipped with an electric energy meter verification buffer band 34, and both ends of the main frame 3 are equipped with a feeding manipulator 35 and a discharging manipulator 36 respectively. ; The two rails 33 are respectively installed with a mobile infrared temperature measuring probe 40 and a liquid crystal recognition probe 37; a sliding rail 41 is installed in the middle of the main frame 3, and a transfer trolley 38 is installed on the sliding rail 41; two rails 33 are installed separately There is a movable translati...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 