Digging method foundation pit structure of steel cover and plate cover, and construction method

A technology of steel cover plate cover and steel cover plate, which is applied in the direction of basic structure engineering, excavation, underwater structures, etc., to achieve the effect of firm connection, avoiding long construction period and avoiding noise problems

Inactive Publication Date: 2009-08-19
SHANGHAI TUNNEL ENGINEERING CO. LTD. +1
View PDF1 Cites 52 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The present invention aims at the above-mentioned deficiencies existing in the prior art, and provides a kind of excavation excavation method foundation pit structure with steel cover plate and its construction method, which can effectively alleviate the space occupied by the foundation pit construction of subway stations in urban building-intensive areas with soft soil and soil. The contradiction between ground traffic pressure reduces the adverse impact of foundation pit construction on the surrounding environment. The new steel cover structure adopted can be reused, which greatly enhances the reuse rate of the structure and reduces the impact of structural waste on the environment. , and at the same time reduce the large deformation of the foundation pit and the noise nuisance problems existing in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Digging method foundation pit structure of steel cover and plate cover, and construction method
  • Digging method foundation pit structure of steel cover and plate cover, and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0030] The project example is a subway station project in Shanghai. The station is located on Changshu Road, from Yanqing Road in the north to Middle Huaihai Road in the south. The station is an island structure with three floors underground, and the main body of the station is a double-column and three-span structure. The length of the station structure is 157.2m, the standard section width is 22.8m, and the platform width is 12m. The thickness of the covering soil on the roof is about 4.7m, the excavation depth of the foundation pit of the standard section is about 24.3m, and the excavation depth of the foundation pit of the end well is about 25.9m. On the south side of the station, there is the subway line 1 in operation. On the east side of the foundation pit, there are Saihua Apartment, Huaihai Building, and an independent villa between them. Buildings No. 3 and No. 2 of the staff residence of the shipping company, and No. 4 building of the Shanghai Center for Disease Co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Diameteraaaaaaaaaa
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a steel cover board covered excavation foundation ditch structure and construction method thereof, belonging to the constructional engineering technical field and comprising a foundation ditch enclosure wall, a construction upright column, an upright column pile, a transverse horizontal bracing, a plurality of longitudinal horizontal bracings, a screens steel board and a steel cover board, wherein, the foundation ditch enclosure wall is positioned on the out edge of an inner construction site foundation ditch, the upright column pile is vertically arranged at the bottom of the foundation ditch and inlayed into the ground bottom, the construction upright column is sheathed in the upright column pile, the transverse horizontal bracing and a plurality of longitudinal horizontal bracings are orthogonally arranged as box type structure, the screens steel board is vertically arranged on the plane surface formed by the transverse horizontal bracing and the longitudinal horizontal bracing and fixed on the crossing point of the transverse horizontal bracing and the longitudinal horizontal bracing, and the steel cover board is arranged on the screens steel board and is in the same plane with the construction site surface. The invention has the advantages of effectively easing the contradiction of occupying sites of foundation ditch construction with the traffic above-ground, increasing the recycling rate of structure material and minishing the influence to environment caused by structure waste material.

Description

technical field [0001] The invention relates to a structure in the technical field of construction engineering and a construction method thereof, in particular to a foundation pit structure with a steel cover plate and a construction method thereof. Background technique [0002] The construction methods of domestic subway stations generally include open-cut method, under-cut method and cover-excavation method. The open cut method is generally suitable for areas with open construction sites and low requirements for surrounding environmental protection. It has the characteristics of wide application range, fast construction speed, simple structure, and relatively low engineering cost. It is one of the most commonly used foundation pit construction methods. . The underground excavation method is a method of underground structure construction using non-ground direct excavation methods, such as mining methods and freezing methods. The mining method is generally applicable to ro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/055E02D17/02
Inventor 余志松裴烈烽陈裕康朱雁飞王建华
Owner SHANGHAI TUNNEL ENGINEERING CO. LTD.
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products