Digging method for preventing strong or strong rock burst on active face
A face and rockburst technology, which is applied in the field of strong or extremely strong rockburst prevention and excavation on the face, to improve the impact resistance of rockbursts, reduce energy levels, and ensure personal safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Embodiment 1: Excavation method for extremely strong rockburst prevention and control on the face, characterized in that the specific steps include,
[0028] a. Carry out blast hole layout and charge design according to the conventional cutting plan, and open a V-shaped cutting 1 on the conventional tunnel surface. The distance from the widest part of the cutting to the excavation sideline is 0.3 times the tunnel 3 diameter D , the narrowest part of the cut 1 is 0.15 times the diameter D of the tunnel 3;
[0029] b. Drilling blastholes for excavation and blastholes for stress relief 2 on the digging face, where the layout of the blastholes for caving and blastholes for smooth surfaces in the blastholes for excavation is designed with reference to the conventional arrangement, and the blastholes for stress relief 2 has four columns, a total of sixteen, symmetrically distributed on both sides of the cut 1, and the distance from the excavation line of the two side walls is...
Embodiment 2
[0034] Embodiment 2: Excavation method for prevention and control of strong rockburst at face, characterized in that the specific steps include,
[0035] a. Carry out blast hole layout and charge design according to the conventional cutting plan, and open a V-shaped cutting 1 on the conventional tunnel surface. The distance from the widest part of the cutting to the excavation sideline is 0.3 times the tunnel 3 diameter D , the narrowest part of the cut 1 is 0.15 times the diameter D of the tunnel 3;
[0036] b. Drilling blastholes for excavation and blastholes for stress relief 2 on the digging face, where the layout of the blastholes for caving and blastholes for smooth surfaces in the blastholes for excavation is designed with reference to the conventional arrangement, and the blastholes for stress relief 2 has four columns, a total of sixteen, symmetrically distributed on both sides of the cut 1, and the distance from the excavation line of the two side walls is 1m and 2m ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com