Steel tube arch rib vertical lifting method
A steel pipe arch rib and vertical technology, applied in arch bridges, buildings, bridge construction, etc., can solve the problems of high construction cost, hoisting, and inability to use cables, etc., to achieve less construction investment, clear structural force, and simple and convenient construction process Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] All features disclosed in this specification, or steps in all methods or processes disclosed, may be combined in any manner, except for mutually exclusive features and / or steps.
[0019] Any feature disclosed in this specification (including any appended claims, abstract and drawings), unless expressly stated otherwise, may be replaced by alternative features which are equivalent or serve a similar purpose. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.
[0020] like figure 1 , figure 2 and image 3 As shown, a vertical lifting method of a steel pipe arch rib: firstly, the steel pipe arch is constructed using the "three-segment method", and the steel pipe arch is divided into three hoisting segments: two side sections 1 and a middle section closing section 2; The position of the arch axis on the top surface of the beam body 3 is provided with an assembled tire frame 4, and a lifting tower 5...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com