Method for processing soft soil foundation of intertidal belt to form construction working face
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- BAOSTEEL ENG & TECH GRP
- Publication Date
- 2010-05-05
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a construction technique for soft soil foundations of coastal tidal flats, in particular to a construction method for performing foundation treatment on soft soil in the intertidal zone of coastal tidal flats to form a construction work surface. Background technique
[0002] my country has a vast tidal flat area. Due to the large tidal range in the coastal waters, the tidal flat area is very flat and the intertidal zone is rich in resources. However, the environment in the intertidal zone is special, the corresponding technical level is limited, the land use value is low, and the development level is not yet high.
[0003] In recent years, land resources in coastal areas have become increasingly tense, and these coastal tidal flat resources have gradually become the target of development. Construction of various structures, such as wind farms, etc. began on tidal flats, that is, the intertidal zone with relatively low land us...