Method for adjusting verticality of tubular pile sunk by hammer
A technology of verticality and adjustment of pipes, applied in sheet pile wall, construction, infrastructure engineering, etc., to achieve the effect of improving piling progress and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] First, the pile is erected on the pile driver; the pile body is adjusted vertically through the adjustment mechanism on the pile driver; the two snap rings of the hoop are clamped on the pile body, so that The guide wheels connected at intervals in the circumferential direction are tightly hugged to the pile body; the front and rear screw rods are connected with the connecting sleeve as a whole, and are symmetrically fixed with a snap ring of the hoop and the pile driver respectively; by rotating the connecting sleeve , change the exposed length of the front and rear screw rods, and precisely adjust the verticality of the pile body; start the pile hammer, drive the pile body vertically into the soil layer along the guide wheel; after the pile sinking, separate the hoop from the pile body, and move the pile driver to The next pile.
[0026] After testing, the verticality of the pile body using the method of the present invention is 0.3% L, where L is the length of the pi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 