Resource control method, device and system
A resource control device and resource control technology, applied in the direction of electrical components, wireless communication, etc., can solve the problems of inability to accept new users, waste of resources, etc., and achieve the effect of improving resource utilization and avoiding vacancy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] Please refer to figure 1 , is a flow chart of a resource control method provided in Embodiment 1 of the present invention, including the following steps:
[0079] Step S101 , determining that the UE in the connected state has no data transmission service within a predetermined time.
[0080] Step S102 , perform a resource reclamation operation for the business.
[0081] The predetermined time is adjustable, and its specific value can be set according to the actual operation of the network, specific needs of users, and operator policies.
[0082] Among them, the specific manner of determining that the UE in the connected state has no data transmission service within a predetermined time may include the following two:
[0083] Method 1. The predetermined time T is represented by the time interval t1 from the uplink data transmission time and the time t2 when the downlink buffer data is empty. For a certain service, when t1>T1 and t2>T2, it can be It is determined that ...
Embodiment 2
[0089] In the first embodiment above, when it is determined that the UE in the connected state has no data transmission service within a predetermined time, the resource reclamation operation for the service is performed. This method is more suitable when the resources of the system are relatively tight and new users are connected, but when the resources of the system are sufficient and no new users are connected, this method may cost some unnecessary overhead. Therefore, Another embodiment of the present invention provides another resource control method, the process of which is as follows figure 2 shown, including the following steps:
[0090] Step S201, determining that the UE in the connected state has no data transmission service within a predetermined time.
[0091] Step S202, judging whether the network environment satisfies the resource recovery condition, if so, proceed to step S203; otherwise, end the process.
[0092] Step S203, execute the resource reclamation o...
Embodiment 3
[0099] For the situation that one or more services of multiple UEs in the connected state have no data transmission within a predetermined time, in order to reflect the difference in service level, different priorities can be set for different users or services, and the users with lower priority The resources corresponding to the business or the resources corresponding to the low priority business are recovered first. Specific process such as image 3 shown, including the following steps:
[0100] Step S301, determining that the UE in the connected state has no data transmission service within a predetermined time.
[0101] Step S302 , judging whether the network environment satisfies resource recovery condition 1, if so, proceed to step S303 ; otherwise, end the process or return to step S302 .
[0102] Step S303, prioritizing the services that have no data transmission for more than a predetermined time.
[0103] The priority of users in different cells can be set accordi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com