Trimming machine for stones
An edge trimmer and stone technology, applied in stone processing tools, stone processing equipment, manufacturing tools, etc., can solve the problems of high labor intensity, cumbersome operation, and low efficiency of workers, and achieve the effect of convenient cutting and improving cutting accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Such as figure 1 , figure 2 , image 3 with Figure 4As shown, the stone edge trimming machine includes a body on which a first saw head 1 and a second saw head 2 are sequentially installed along the longitudinal direction; the first saw head 1 and the second saw head 2 respectively include a saw Head body, the saw blade rotating shaft 3 is installed transversely relative to the body on the saw head body, the saw blade rotating shaft 3 is respectively installed on the first saw head 1 and the second saw head 2, the first Two saw blades 4 are installed at intervals on the saw blade rotating shaft 3 of the saw head 1, and four saw blades 4 are equidistantly installed on the saw blade rotating shaft 3 of the second saw head 2. The saw blades 4 of the head 1 and the second saw head 2 have different pitches; it is also possible to install a plurality of saw blades at unequal intervals on the saw blade shaft of the first saw head. Install multiple saw blades at unequal i...
Embodiment 2
[0027] Such as Figure 5 , Image 6 with Figure 7 As shown, the structure of this embodiment is basically the same as that of Embodiment 1, except that the saw blade clamping flange includes a first saw blade clamping flange 21 and a second saw blade clamping flange Disk 22, one end of the saw blade rotating shaft adjustment and stabilization bracket 7 is provided with a bearing seat, and a bearing is installed in the bearing seat, and the bearing is installed on the saw blade fixing bushing 25, and the saw blade fixing bushing 25 is set On the saw blade rotating shaft 3, the saw blade fixing bushing 25 is integrated with the first saw blade clamping flange 21, and the first saw blade clamping flange 21 and the second saw blade clamping flange 21 are integrated. The saw blade 4 is clamped and fixed by fasteners between the saw blade clamping flange 22; four saw blades are equidistantly installed on the saw blade shaft of the first saw head 1, and the second saw head Six sa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 