Precast concrete wallboard and preparation method thereof
A technology of prefabricated concrete and production methods, which is applied in the fields of formwork/formwork/work frame, preparation of building components on site, and processing of building materials, etc., which can solve the problems of unguaranteed construction quality, high construction cost, and large transportation volume. , to achieve the effect of saving the decoration period, reducing construction waste and uniform quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] Embodiment one sees Figure 1-4 As shown, this prefabricated concrete wall panel has a structural layer 1 and a protective layer 2 in sequence from the inside to the outside, the structural layer has a steel cage, the concrete of the protective layer 2 has a steel mesh, and the protective layer 2 The horizontal connecting steel bars 24 connected to the reinforcement mesh are connected to the structural layer 1, the left and right edges of the protective layer 2 protrude from the structural layer 1, the lower edge of the protective layer 2 extends downwards from the protrusion 7, and the top of the protective layer 2 protrudes upwards For the structural layer 1, the upper edge of the protective layer has a notch 8 corresponding to the notch of the adjacent precast concrete wall panel on the upper layer. When concrete is poured at the connecting joint between two adjacent prefabricated concrete wall panels, the protective layer 2 can serve as a template, which simplifies ...
Embodiment 2
[0062] Embodiment two see Figure 5 , the outer surface of the protective layer 2 is connected with an outer decorative layer 4, and the outer decorative layer 4 is a face brick, a paint or a decorative board.
[0063] The manufacturing method of this prefabricated concrete wall panel, step 1, assembling bottom mold; Step 2, place protective layer reinforcement mesh sheet on the bottom mold; Insert the horizontal connecting steel bar 24 on the protective layer concrete; step five, vibrate as a whole, so that the horizontal connecting steel bar 24 is closely combined with the protective layer concrete; step six, support the side form; step seven, place a reinforcement cage and a steel bar suspension ring on the protective layer 15 and internally threaded sleeve 9, the reinforcement cage includes horizontal tie reinforcement 14 and longitudinal connection reinforcement 10, the reinforcement sleeve 6 is fixedly connected with the structural layer reinforcement cage, the grouting ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com