X56 pipeline steel and production method thereof
A production method and pipeline steel technology, applied in the field of metal material processing and forming, to achieve high added value, prevent mixed crystals, and high technical content
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0051] A. The slab with the following chemical composition: C 0.06wt%, Si 0.2wt%, Mn 1.3wt%, S 0.007wt%, P 0.018wt%, Nb 0.035wt%, V 0.02wt%, Ti 0.01wt%, N 0.007wt%, Als 0.01wt%, and the rest are Fe and unavoidable impurities, which are sent to a walking beam heating furnace with a temperature of 1210°C in the soaking section and heated for 230 minutes. The period of time is 60 minutes to ensure that the Nb and V microalloys precipitated in the slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0052] B. Use high-pressure water with a pressure of 17MPa to spray and descale the front and back sides of the slab out of the furnace for 13 seconds;
[0053] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1060°C for 4 passes of continuous rough rolling. At t...
Embodiment 2
[0058] A. The slab with the following chemical composition: C 0.09wt%, Si 0.3wt%, Mn 1.5wt%, S 0.008wt%, P 0.016wt%, Nb 0.055wt%, V 0.04wt%, Ti 0.22wt%, N 0.008wt%, Als 0.04wt%, and the rest are Fe and unavoidable impurities, which are sent to a walking beam heating furnace with a temperature of 1250°C in the soaking section and heated for 130 minutes. The period of time is 40 minutes to ensure that the Nb and V micro-alloys precipitated in the slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0059]B. Use high-pressure water with a pressure of 15MPa to spray and descale the front and back sides of the slab out of the furnace for 15 seconds;
[0060] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1160°C for 4 passes of continuous rough rolling. At t...
Embodiment 3
[0065] A. The slab with the following chemical composition: C 0.07wt%, Si 0.25wt%, Mn 1.4wt%, S 0.007wt%, P 0.017wt%, Nb 0.045wt%, V 0.03wt%, Ti 0.018wt%, N 0.008wt%, Als 0.02wt%, and the rest are Fe and unavoidable impurities, which are sent to a walking beam heating furnace with a temperature of 1200°C in the soaking section and heated for 185 minutes. The time of the section is 50 minutes to ensure that the Nb and V microalloys precipitated in the steel slab are fully re-dissolved, the austenite grains are refined and the controlled cooling precipitation after rolling is prepared, the internal structure of the slab is uniform, and the furnace is released;
[0066] B. Use high-pressure water with a pressure of 20MPa to spray and descale the front and back sides of the slab out of the furnace for 10 seconds;
[0067] C. Send the descaled slab to the double-stand compact steckel rolling mill, and control the rolling start temperature to 1100°C for 4 passes of continuous rough ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com