Built-in rope net rammed earth wall body and construction method thereof
A construction method and rammed earth wall technology, which can be applied to building structures, walls, buildings, etc., can solve problems such as low seismic capacity of raw soil buildings, and achieve the effects of convenient construction, improved limit displacement, and simple construction technology.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] In this embodiment, the prototype size of the wall is 3300×2400×480mm, and the following construction techniques can be used in the construction process:
[0033] Step 1. According to the size and structural requirements of the rammed earth wall, select a brown rope with a diameter of about 20mm, and weave two rope nets with a small rectangular grid with a side length of about 300mm. The final rope net size is 3300×2400mm, and then the rope The net is soaked in water for use;
[0034] Step 2, excavating the foundation groove of the wall and tamping the foundation of the wall;
[0035] Step 3, ramming the formwork;
[0036] Step 4, according to the thickness and structural requirements of the rammed earth wall, place a piece of rope net at a position 120mm away from the wall template, parallel to the template;
[0037] Step 5: Fill the formwork with raw soil layer by layer. Each layer of soil is about 150mm thick. Since the inner space of the formwork is divided into t...
Embodiment 2
[0041] In this embodiment, the wall prototype size is 3300×2400×480mm, and the construction process can adopt the following construction process:
[0042] Step 1. According to the size and structural requirements of the rammed earth wall, select a brown rope with a diameter of about 20mm, and weave two rope nets with a small rectangular grid with a side length of about 300mm. The size of the rope net is selected as 4300×3400mm (each end stretch about 500mm from the wall), and then soak the rope net in water for use;
[0043] Step 2, excavating the foundation groove of the wall body and tamping the foundation of the wall body. According to the thickness and structural requirements of the rammed earth wall, the bottom end of the rope net is buried in the wall foundation, and a piece of rope net is placed at a position 120mm away from the outer side of the wall. The rope net surface is parallel to the outer surface of the rammed earth wall. The bottom end of the net is embedded ...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap