The utility model discloses a hidden type aerial
fog dust falling construction
system after sand shale interbed tunnel excavation blasting. Comprising a rack
supporting system, a high-pressure spraying dust-
settling system and a high-pressure wind
path system, the rack
supporting system is an excavation trolley, the nozzles are divided into a spraying dust-
settling nozzle and a high-pressure air path
nozzle, the
pipe body is divided into a spraying dust-
settling pipe body and a high-pressure air path
pipe body, the high-pressure spraying dust-settling
system comprises a spraying high-pressure pump and a high-pressure
water pipe connector, and one end of the high-pressure
water pipe connector is communicated with an inlet of the spraying high-pressure pump; the outlet end of the spraying high-pressure pump is connected with a spraying dust-settling
nozzle through a spraying dust-settling pipe body, and the high-pressure air pipe connector is communicated with a high-pressure air path nozzle through a high-pressure air path pipe body. After a tunnel excavation working face adopts the excavation rack hidden type aerial
fog dust falling system, water mist flow can surround the section of a lining, settle dust and prevent the dust from flying into the air, meanwhile, rocks are wetted, the generation amount of the dust during falling of the rocks is reduced, the dust throwing length is shortened to 60 m, the
smoke exhaust time after blasting is shortened, the construction efficiency is improved, and the construction cost is reduced. And the construction temperature in the hole is reduced.