Construction device for rammed bulb pile and construction method using device

A construction device and construction method technology, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as complicated procedures, slow construction speed, and non-continuous tamping, and achieve low failure rate, fast construction speed, and structural simple effect

Inactive Publication Date: 2012-10-17
翟宇思
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The purpose of the present invention is to solve the problems of complicated procedures and slow construction speed in existing pile-forming methods.
In-hole deep dynamic compaction piles (DDC pile method) have more prominent rammer defects, and several forms have the problem of not being able to ram continuously, and there are major defects in reliability and safety, so a construction device for tamping and expanding piles is provided and the construction method using the device

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction device for rammed bulb pile and construction method using device
  • Construction device for rammed bulb pile and construction method using device
  • Construction device for rammed bulb pile and construction method using device

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach 1

[0024] Specific implementation mode 1: For this implementation mode, see Figure 1 ~ Figure 4 , including: a weight 1, a hammer rod and a lifting ring 5, the lower end of the hammer rod is fixedly connected to the upper end of the weight 1, the upper end of the hammer rod is fixedly connected to the lifting ring 5, and the center of the weight 1 is provided with a material channel 8. There are two cavities 1-1 in the hammer body of the heavy hammer 1, each cavity 1-1 is equipped with a hydraulic cylinder 1-2, and the lower part of the hammer body is provided with two symmetrical discharge valves 1- 5. The discharge valve 1-5 is hinged with the lower part of the hammer body through the hinge key 1-4, and the free end of the hydraulic rod 1-3 of the hydraulic cylinder 1-2 is hinged with the discharge valve 1-4.

specific Embodiment approach 2

[0025] Specific implementation mode two: for this implementation mode, see figure 1 , the hammer rod includes a connecting flange 2, a tube 3 and a top tube 4, the two ends of the tube 3 are fixedly connected with the flange 2, and the lower end of the top tube 4 is fixedly connected with a flange 2. A lifting ring 5 is fixed on the upper end of the top tube 4 . Others are the same as in the first embodiment.

specific Embodiment approach 3

[0026] Specific implementation mode three: for this implementation mode, see figure 2 , the hammer rod includes a connecting flange 2, a tube 3, a top tube 4, a pin (or top wire) 6 and a bottom tube 9, and the tube 3 is a plug-in connection, and the two tubes The tubes 3 are fixed by pin shafts 6 , the lower end of the bottom tube tube 9 is fixed with a flange 2 for connecting with the weight 1 , and the upper end of the top tube tube 4 is fixed with a lifting ring 5 . Others are the same as in the first embodiment.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction device for a rammed bulb pile and a construction method using the device. The construction device is as follows: the lower end of a hammer rod is fixedly connected with the upper end of a heavy hammer, the upper end of the hammer rod is fixedly connected with a lifting ring, a material channel is arranged at the center in the heavy hammer, two cavities are arranged in a hammer body of the heavy hammer, a hydraulic cylinder is arranged in each cavity, two symmetrical discharge valves are arranged at the lower part of the hammer body, the discharge valves are hinged with the lower part of the hammer body through hinges, and the free ends of hydraulic rods of the hydraulic cylinders are hinged with the discharge valves. The construction method comprises the following steps: impacting repeatedly by using free falling of the heavy hammer for forming a hole till the designed scale height, then lifting the heavy hammer and the hammer rod upwards by the height of not less than 30cm, opening the discharge valves of the heavy hammer, charging materials to the bottom of the hole through a pipe barrel and the material channel of the heavy hammer, performing the impacting and end enlargement, and then pouring for forming the pile. The materials are charged to the bottom of the hole through the hammer rod and the channel in the heavy hammer, unhooking is not required during tamping, the tamping can be continuously performed, the construction speed is fast, and the depth of the formed pile can achieve 50 meters.

Description

technical field [0001] The invention relates to a construction device for a rammed and expanded pile and a construction method using the device. Background technique [0002] The existing rammed and expanded piles used in engineering mainly include the following two methods of forming piles: [0003] 1. Reinforced concrete rammed and expanded carrier piles (representative patents include: ①Patent No. ZL98101041.5, titled "Construction Method for Concrete Pile", date of authorization announcement is May 10, 2000, authorization announcement number is CN1052284C ; ②The patent number is ZL01138624.X, the name is "Concrete Pile Construction Method", the authorized announcement date is February 4, 2004, and the authorized announcement number is CN1137314C; ③The patent number is ZL00106288.3, ​​and the name is "Concrete Pile Foundation The date of authorization announcement is September 18, 2002, and the authorization announcement number is CN1091195C), and its disadvantages are: ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/44
Inventor 翟宇思翟宇飞丛晓辉翟宇桥翟向滨翟向阳
Owner 翟宇思