Construction device for rammed bulb pile and construction method using device
A construction device and construction method technology, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as complicated procedures, slow construction speed, and non-continuous tamping, and achieve low failure rate, fast construction speed, and structural simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0024] Specific implementation mode 1: For this implementation mode, see Figure 1 ~ Figure 4 , including: a weight 1, a hammer rod and a lifting ring 5, the lower end of the hammer rod is fixedly connected to the upper end of the weight 1, the upper end of the hammer rod is fixedly connected to the lifting ring 5, and the center of the weight 1 is provided with a material channel 8. There are two cavities 1-1 in the hammer body of the heavy hammer 1, each cavity 1-1 is equipped with a hydraulic cylinder 1-2, and the lower part of the hammer body is provided with two symmetrical discharge valves 1- 5. The discharge valve 1-5 is hinged with the lower part of the hammer body through the hinge key 1-4, and the free end of the hydraulic rod 1-3 of the hydraulic cylinder 1-2 is hinged with the discharge valve 1-4.
specific Embodiment approach 2
[0025] Specific implementation mode two: for this implementation mode, see figure 1 , the hammer rod includes a connecting flange 2, a tube 3 and a top tube 4, the two ends of the tube 3 are fixedly connected with the flange 2, and the lower end of the top tube 4 is fixedly connected with a flange 2. A lifting ring 5 is fixed on the upper end of the top tube 4 . Others are the same as in the first embodiment.
specific Embodiment approach 3
[0026] Specific implementation mode three: for this implementation mode, see figure 2 , the hammer rod includes a connecting flange 2, a tube 3, a top tube 4, a pin (or top wire) 6 and a bottom tube 9, and the tube 3 is a plug-in connection, and the two tubes The tubes 3 are fixed by pin shafts 6 , the lower end of the bottom tube tube 9 is fixed with a flange 2 for connecting with the weight 1 , and the upper end of the top tube tube 4 is fixed with a lifting ring 5 . Others are the same as in the first embodiment.