Construction method for piles
A construction method and pile position technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve problems such as large impact, large construction noise, large vibration, etc., and achieve good pile quality, low construction noise, and environmental impact. small effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] A construction method for piles, comprising the steps of:
[0029] (1) In place: place the appearance of the equipment on the set pile position;
[0030] (2) Sink the outer tube to the set depth; the method of sinking the tube is:
[0031] (a) Inner rammed earth body: Lift the inner ramming hammer inside the outer tube to move up and down, and punch the soil or pile body under the outer tube to form a shear opening;
[0032] (b) Sinking of the outer tube: the outer tube sinks by at least one of the following methods: ①Under the weight of the outer tube, the outer tube sinks along the shear opening by gravity; ②Activate the back pressure or static pressure device on the outer tube, The outer tube sinks under pressure along the shear opening; ③Start the vibration device on the outer tube, and the outer tube vibrates and sinks along the shear opening; ④Start the vibration and pressure device on the outer tube at the same time, and the outer tube vibrates along the shear o...
Embodiment 2
[0044] A construction method for piles, comprising the steps of:
[0045] (1) In place: place the appearance of the equipment on the set pile position;
[0046] (2) Sink the outer tube to the set depth; the method of sinking the tube is:
[0047] (a) Inner rammed earth body: Lift the inner ramming hammer inside the outer tube to move up and down, and punch the soil or pile body under the outer tube to form a shear opening;
[0048] (b) Sinking of the outer tube: the outer tube sinks by at least one of the following methods: ①Under the weight of the outer tube, the outer tube sinks along the shear opening by gravity; ②Activate the back pressure or static pressure device on the outer tube, The outer tube sinks under pressure along the shear opening; ③Start the vibration device on the outer tube, and the outer tube vibrates and sinks along the shear opening; ④Start the vibration and pressure device on the outer tube at the same time, and the outer tube vibrates along the shear o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com