Continuous stamping thinning drawing forming process
A technology of stretch forming and process, which is applied in the field of continuous stamping, thinning and stretch forming, can solve the problems of not being able to meet the requirements of the production process, and can not guarantee to reach the IT11 level (0.1mm, material tensile performance decline, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Embodiment 1: as Figure 3-Figure 4 As shown, the process steps of this embodiment are as follows:
[0026] 1.1. Cut the material according to the diameter Ds of the shape of the flange material to form a material with a flange; in this example, the cutting line is basically Figure 5 The parentheses shown form the flange portion of the tablet;
[0027] 1.2. Extension 1-3 is stretching with gaps, where:
[0028] 1.2.1. Extension 1, the extension coefficient is 0.57, namely: D1=0.57Ds, D1 is the outer diameter of the cylinder pulled out during the extension process, and Ds is the diameter of the flanged material (in this example, Ds is 27mm) , the radius R1 of the concave die mouth is 3.3 times the thickness t of the material to be processed (in this example, the thickness t is 0.5mm), the gap between the concave and convex dies is 1.05 times the thickness t of the material to be processed, and the drawing height should be such that The raised material volume is sligh...
Embodiment 2
[0035] Embodiment 2: as Figure 3-Figure 4 As shown, the process steps of this embodiment are as follows:
[0036] 1.1. Cut the material according to the diameter Ds of the shape of the flange material to form a material with a flange. In this example, the cutting line is basically Figure 5 parentheses shown;
[0037] 1.2. Extension 1-3 is stretching with gaps, where:
[0038]1.2.1. Extension 1, the extension coefficient is 0.62, that is: D1=0.62Ds, D1 is the outer diameter of the cylinder pulled out during the extension process, and Ds is the diameter of the flanged sheet (in this example, Ds is 27mm) , the radius R1 of the concave die mouth is 3.3 times the thickness t of the material to be processed (in this example, the thickness t is 2mm), the gap between the concave and convex dies is 1.05 times the thickness t of the material to be processed, and the stretching height should be such that the The high material volume is slightly more than the required material volume...
Embodiment 3
[0045] Embodiment 3: as Figure 3-Figure 4 As shown, the process steps of this embodiment are as follows:
[0046] 1.1. Cut the material according to the diameter Ds of the shape of the flange material to form a material with a flange. In this example, the cutting line is basically Figure 5 parentheses shown;
[0047] 1.2. Extension 1-3 is stretching with gaps, where:
[0048] 1.2.1. Extension 1, the extension coefficient is 0.59, that is: D1 = 0.59Ds, D1 is the outer diameter of the cylinder pulled out during the extension process, and Ds is the diameter of the flanged material (in this example, Ds is 27mm) , the radius R1 of the concave die mouth is 3.3 times the thickness t of the material to be processed (in this example, the thickness t is 1.2mm), the gap between the concave and convex dies is 1.05 times the thickness t of the material to be processed, and the stretching height should be such that The volume of the raised material is slightly more than the volume of t...