[0018] The construction process of the pile foundation of Sanjiang Town Extra Large Bridge is as follows:
[0019] 1. Use a drill bit with a diameter of 2.0m to impact to a depth of 25m. During the drilling process, pay attention to the specific gravity of the mud not less than 1.2kg / l. (keep the holes from collapsing)
[0020] 2. During the drilling process, the support foundation is treated, and C20 concrete strip foundations are set at the four corners of the support. The foundation is 1.5m long, 1m wide and 0.5m thick, and the top surface is flush with the drilling rig platform. A layer of reinforced mesh with a vertical and horizontal spacing of 15cm and a diameter of 10mm is provided at the bottom of the foundation. After testing, the bearing capacity of the platform foundation is 90kpa, and the bearing capacity of the four foundations is 4×1.5×1×90=540KN, which meets the requirements.
[0021] 3. After the drilling reaches a depth of 25m, remove the drilling rig, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com