Underground excavation tunnel construction leakage water treatment method

A technology for tunnel construction and treatment methods, applied in tunnels, tunnel linings, chemical instruments and methods, etc., can solve the problems of tunnel plane cracks, poor overall practicability, and slow molding speed, and achieve fast molding speed, simple construction, and favorable curing Effect

Pending Publication Date: 2022-07-05
BEIJING NO 4 MUNICIPAL CONSTR ENG
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the grouting treatment method still has deficiencies in the construction process, for example, there may be air bubbles in the leaking water and the injected slurry, which may easily lead to cracks in the repaired tunnel plane; the repair effect in the grouting construction is poor, the forming speed is slow, and the overall Poor practicality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] A method for treating leakage water in the construction of an undercut tunnel, comprising the following steps:

[0032] (1) Detect and determine the leakage area of ​​the tunnel; use the spin imaging technology to detect the spatial distribution of water in the surrounding rock of the tunnel in real time, so as to determine the areas that may leak or have leaked in the surrounding rock of the tunnel, and mark them. and establish safety assessment criteria;

[0033] (2) Drilling and repairing holes for reinforcement; according to the areas and conditions that may leak or have occurred determined in step (1), calculate and analyze the length and number of holes for reinforcement and repair that meet the requirements of plugging and strengthening the strength of the structure, A plurality of reinforcing and repairing holes meeting the length requirements are evenly drilled in the area;

[0034] (3) Clean up the interior of the reinforced repair hole;

[0035] (4) Prepara...

Embodiment 2

[0048] A method for treating leakage water in the construction of an undercut tunnel, comprising the following steps:

[0049] (1) Detect and determine the leakage area of ​​the tunnel; use the spin imaging technology to detect the spatial distribution of water in the surrounding rock of the tunnel in real time, so as to determine the areas that may leak or have leaked in the surrounding rock of the tunnel, and mark them. and establish safety assessment criteria;

[0050] (2) Drilling and repairing holes for reinforcement; according to the areas and conditions that may leak or have occurred determined in step (1), calculate and analyze the length and number of holes for reinforcement and repair that meet the requirements of plugging and strengthening the strength of the structure, A plurality of reinforcing and repairing holes meeting the length requirements are evenly drilled in the area;

[0051] (3) Clean up the interior of the reinforced repair hole;

[0052] (4) Prepara...

Embodiment 3

[0065] A method for treating leakage water in the construction of an undercut tunnel, comprising the following steps:

[0066] (1) Detect and determine the leakage area of ​​the tunnel; use the spin imaging technology to detect the spatial distribution of water in the surrounding rock of the tunnel in real time, so as to determine the areas that may leak or have leaked in the surrounding rock of the tunnel, and mark them. and establish safety assessment criteria;

[0067] (2) Drilling and repairing holes for reinforcement; according to the areas and conditions that may leak or have occurred determined in step (1), calculate and analyze the length and number of holes for reinforcement and repair that meet the requirements of plugging and strengthening the strength of the structure, A plurality of reinforcing and repairing holes meeting the length requirements are evenly drilled in the area;

[0068] (3) Clean up the interior of the reinforced repair hole;

[0069] (4) Prepara...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
particle sizeaaaaaaaaaa
particle sizeaaaaaaaaaa
diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a water leakage treatment method for underground excavation tunnel construction. The water leakage treatment method comprises the following steps: (1) detecting and determining a tunnel leakage area; (2) drilling reinforced repair holes; (3) the interiors of the reinforced repair holes are cleaned; (4) preparing a leaking stoppage material and a reinforced reinforcement cage; (5) the prepared leaking stoppage material is put into the prepared reinforcing steel reinforcement cages, and then the multiple reinforcing steel reinforcement cages are inserted into the reinforcing repairing holes correspondingly; and (6) sealing the inner surface of the tunnel. According to the construction method, bubbles existing during water leakage construction can be effectively removed, the repairing effect is good, the forming speed is high, water leakage construction can be conducted in a targeted mode, construction is easy and convenient, blind and excessive repairing construction is avoided, the construction cost is greatly saved, the construction progress is shortened, and the construction efficiency is improved. The effects of accurately repairing the target and enhancing the overall structural strength of the tunnel are achieved.

Description

technical field [0001] The invention relates to the technical field of tunnel construction for underground engineering, in particular to a method for treating leakage water in underground tunnel construction. Background technique [0002] In recent years, with the needs of my country's subway, highway and railway engineering construction, a large number of tunnel projects have been built accordingly. There may be cracks in the tunnel project or after the tunnel is completed. There are various types of cracks, and the reasons for the formation of cracks are also various. Faced with cracks in the tunnel, if they are not dealt with in time, they will inevitably appear. Water leakage and other conditions, if the situation is serious, will even affect the service life of the entire tunnel. For this reason, when cracks are found in tunnel construction, the corresponding leakage water treatment will be carried out in time; [0003] The leakage water treatment method in the prior a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/38C09K3/12
CPCE21D11/38C09K3/12
Inventor 郑仔弟史磊磊张德成黄民刘铭洋张艺嘉
Owner BEIJING NO 4 MUNICIPAL CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products