Production process of automobile sound-insulating and heat-insulating pad
A production process and heat-insulating pad technology, applied in the field of automotive interior parts, can solve the problems affecting the smooth delivery of the main engine factory, the fool-proof logo is unclear, and the processing technology needs to be developed, so as to reduce the packaging cost and reduce the operation. Requirement, practical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] Prepare heat insulation pads for the left and right hubcaps of model 055A
[0012] Concrete preparation process is as follows:
[0013] a. Select the specifications: 1000mm×900mm×25mm soft and hard layer thermoplastic back-spun cotton, put the soft and hard layer thermoplastic back-spun cotton into the ceramic far-infrared radiation heating oven for suspended drying, the upper and lower parts of the ceramic far-infrared radiation heating oven The temperature in the heating zone is set at 280°C, and the drying time is controlled at 170s;
[0014] b. Adopt a punching mold with a cooling water circulation system inside, continuously feed cooling water at a temperature of 6°C, install the upper and lower molds of the punching mold on the molding machine, and heat the hard and soft layers back to The spun cotton is placed between the upper and lower dies of the punching die, and the forming machine is started, so that the upper die and the lower die of the punching die are ...
Embodiment 2
[0018] Prepare the heat insulation pads for the left and right hubcaps of model 073A
[0019] Concrete preparation process is as follows:
[0020] a. Select the specifications: 1200mm×950mm×25mm soft and hard layer thermoplastic back-spun cotton, put the soft and hard layer thermoplastic back-spun cotton into the ceramic far-infrared radiation heating oven for suspended drying, and the upper and lower parts of the ceramic far-infrared radiation heating oven The temperature in the heating zone is set at 300°C, and the drying time is controlled at 175s;
[0021] b. Adopt a punching mold with a cooling water circulation system inside, continuously feed cooling water at a temperature of 7°C, install the upper and lower molds of the punching mold on the molding machine, and heat the hard and soft layers back to Put the spun cotton between the upper die and the lower die of the punching die, and start the forming machine, so that the upper die and the lower die of the punching die ...
Embodiment 3
[0025] Preparation of front hubcap heat insulation pad model 503W
[0026] Concrete preparation process is as follows:
[0027] a. Select the specifications: 1300mm×940mm×20mm soft and hard layer thermoplastic back-spun cotton, put the soft and hard layer thermoplastic back-spun cotton into the ceramic far-infrared radiation heating oven for suspended drying, the upper and lower parts of the ceramic far-infrared radiation heating oven The temperature in the heating zone is set at 320°C, and the drying time is controlled at 180s;
[0028] b. Adopt a punching mold with a cooling water circulation system inside, continuously feed cooling water at a temperature of 8°C, install the upper mold and lower mold of the punching mold on the molding machine, and heat the hard and soft layers back to The spun cotton is placed between the upper and lower dies of the punching die, and the forming machine is started, so that the upper die and the lower die of the punching die are pressed tig...