Pile-top hinge structure of high-pile wharf
A high-pile wharf and pile top technology, which is applied in water conservancy projects, sea area engineering, construction, etc., can solve the problems of reducing the bending moment of the pile top, uncertain connection mode, pile top bending damage, etc., and achieves reliable work.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0040] see figure 1 with figure 2 , the pile top hinged structure of the high-pile wharf provided by the present invention is mainly composed of a bottom plate structure, a steel cage (023), a shear steel pipe (031), a middle plate (041), a top plate (051), and a side flexible anti-corrosion layer (064) composition.
[0041] The bottom plate structure includes formwork (014), formwork hanging ribs (012) and annular bottom plate (011). The annular bottom plate (011) can be placed on the top surface of the pile (061) by adhesive.
[0042] The steel cage (023) extends into the pile through the annular bottom plate (011), and the main tensile reinforcement (021) on it is provided with a sliding layer (022) near the contact surface, and the upper...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 