A technology of ethylene cracking furnace and radiant coil, which is applied in cracking, non-catalytic thermal cracking, petroleum industry, etc. It can solve the problems of wasted construction time, long welding and assembly time, inconvenient disassembly and installation, etc., and achieves the quality assurance of welding and assembly , The installation workload is small, and the effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] This is a newly built pyrolysis furnace, and the height H of the radiant coil 3 is less than the length L of the hearth of the radiant section, so there is enough room for rotation when installing the radiant coil 3:
[0034] Such as Figure 1~2 As shown, before the radiant coil is installed, the following work should be done: a) Install the movable support beam 1 in place on the upper part of the furnace roof 8 of the radiant section, and then connect one end of each set of pulley blocks 2 to the movable support beam 1 , the number of pulley blocks used for hoisting a group of radiant coils is 3 groups; b) open a rectangular opening at the furnace bottom 7 of the radiant section, and the opening is at least the size of an opening for accommodating a group of radiant coils; c) A rectangular opening is opened on the furnace top 8 of the radiant section, and the size of the opening is such that a group of radiant coils are installed; d) the transport vehicle 5 is in place...
Embodiment 2
[0037] This is an established cracking furnace, and the height H of the radiant coil 3 is less than the length L of the hearth of the radiant section, so there is enough space for the rotation of the radiant coil 3:
[0038] Such as Figure 1~2 As shown, before installing the radiant coil, the following work should be done: a) Install the movable support beam 1 in place on the upper part of the furnace roof 8 in the radiant section, and then connect one end of each group of guide chains to the movable support beam 1 , the number of pulley blocks used for hoisting a group of radiant coils is 3 groups; b) dismantling the furnace bottom sealing cover 6; c) disassembling the furnace top sealing cover 9; d) the transport vehicle 5 is in place.
[0039]After the pre-installation work is completed, start to install the radiant coils, the steps are as follows: a) first put a group of radiant coils 3 with the lifting frame 4 on the transport vehicle, and then transport them to the bott...
Embodiment 3
[0041] This is a new pyrolysis furnace, and the height H of the radiant coil 3 is greater than the length L of the furnace in the radiant section, resulting in insufficient rotation space for installing the radiant coil 3:
[0042] Such as Figure 3-4 As shown, before the installation of the radiant coil, in addition to the work before the installation in "Embodiment 1", the following work should be done: open a rectangular opening from the bottom to the end wall 10 of the radiant section, and the opening is At least one opening sized to accommodate a set of radiant coils.
[0043] After the pre-installation work is completed, the installation of the radiant coil is started. The steps are the same as in "Example 1". The rectangular opening that opens also will pass through the rectangular opening that radiation section end wall 10 opens. Finally, after each set of welding and assembly work is completed, in addition to sealing the openings of the furnace bottom and roof with ...