Whole bridge jacking construction method without interrupting traffic
A technology of integral jacking and construction methods, applied in bridges, bridge maintenance, bridge reinforcement, etc., to achieve the effects of low cost, simple construction process, and short cycle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] Below in conjunction with accompanying drawing, the present invention is described in detail: as figure 1 Shown, the construction method step of the present invention is
[0047] 1. With the center of the road as the center, traffic on one side is blocked, and the other side is changed from a one-way line to a two-way line;
[0048]2. Remove the road pavement blocking the road on the traffic side (but do not remove the pavement pavement of the original bridge deck), pour concrete temporary blocks at the designated positions, and backfill the earthwork and compact it; Floating bladder-type steel ladder frame. At this time, the temporary lane is set up, and the traffic on this side is resumed, and it is set as a two-way lane;
[0049] 3. Block the traffic on the non-construction side, follow step 2 for construction, and resume after completion.
[0050] 4. The entire bridge starts to be lifted synchronously as a whole. When the lane surface of the floating airbag-type ...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com