Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel construction informatization dynamic monitoring system and monitoring method thereof

A technology for dynamic monitoring and tunnel construction, applied in signal transmission systems, closed-circuit television systems, and earth-moving drilling, etc., can solve the problems of insufficient monitoring frequency and the impact of monitoring data accuracy, and achieve a safe and practical method, avoiding insufficient monitoring frequency, and safety. high sex effect

Inactive Publication Date: 2012-07-18
XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
View PDF5 Cites 54 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] In view of the defects or deficiencies in the above-mentioned background technology, the purpose of the present invention is to provide a tunnel construction information dynamic monitoring system based on DIC digital correlation technology and its monitoring method, which is used to solve the problem that the accuracy of monitoring data in the prior art is affected by the environment, artificial Influenced by operation and accuracy of the instrument itself; affected by tunnel span and scale, tunnel construction and tunnel safety; affected by insufficient monitoring frequency and the need for sufficient monitoring technicians, and solving the problem of large-scale image deformation correction based on DIC image correlation technology , to solve the problem of comprehensively guiding the tunnel construction process through the data of required and selected items

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel construction informatization dynamic monitoring system and monitoring method thereof
  • Tunnel construction informatization dynamic monitoring system and monitoring method thereof
  • Tunnel construction informatization dynamic monitoring system and monitoring method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific implementation methods.

[0044] Such as figure 1 As shown, the tunnel construction information dynamic monitoring system includes:

[0045] The industrial computer includes a computer control console 1 containing an acquisition control program module 2 and a real-time image and data analysis module 8, which is used to remotely control the monitoring of tunnel construction and the analysis of data results;

[0046] PLC wireless controller 3, including a decoding module, a wireless master control device component and a wireless slave device, is used to decode the instructions issued by the acquisition control program module 2 in the industrial computer, control the image acquisition of the digital camera 4, and control the digital display acquisition device at the same time 6 data collection;

[0047] Digital camera 4, used to collect image data of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a tunnel construction informatization dynamic monitoring system and a monitoring method thereof. The system comprises an industrial personal computer, a PLC (programmable logic controller) wireless controller, a high-configuration digital camera, a deformation monitoring sensitization part, digital display acquisition equipment, wireless transmission equipment and a dynamic design feedback device. The method includes: 1), controlling commands to be transmitted to the PLC wireless controller by a computer control main station and controlling the digital camera and the digital display acquisition equipment; 2), acquiring internal force monitoring data by the aid of the digital display acquisition equipment; and acquiring a deformation monitoring image via the deformation monitoring sensitization part by the digital camera; 3), transmitting a monitored value to the computer control main station by the aid of the wireless transmission equipment; 4), analyzing results by the computer control main station via a real-time analysis module; and 5), transmitting the analyzed results to the dynamic design feedback device, analyzing relative difference of the really monitored value and a standard value, and early warming in real time by an early warning module. The tunnel construction informatization dynamic monitoring system is scientific, safe and practical, the method is convenient, instant, fast and effective, and safety problems in construction monitoring of tunnels are avoided.

Description

technical field [0001] The present invention relates to a tunnel construction informatization dynamic design system and method, more specifically to DIC digital image correlation technology, wireless control and transmission technology, and also to a comprehensive evaluation and early warning technology, especially suitable for large tunnels in complex and harsh environments The real-time monitoring and information-based dynamic design are suitable for projects with high monitoring accuracy requirements. Background technique [0002] Due to the complex geological environment and lack of basic information in the construction of tunnels, the design of underground engineering cannot be completed in one step before construction starts. This is an important feature that distinguishes underground engineering from other civil engineering. Therefore, at present, the design and construction of tunnels in underground engineering widely adopt the information-based design-construction o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F17/18H04N7/18G08C17/02
Inventor 邵珠山宋林王新宇乔汝佳李晓照陈福成
Owner XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products