Epoxy asphalt for roads and bridges and preparation method for same

A technology of epoxy asphalt, road and bridge, applied in the direction of building components, building insulation materials, buildings, etc., can solve the problems that affect the application of epoxy asphalt, have not been solved well, and the product formula is single, so as to slow down the curing reaction speed , increase the filling volume and reduce the cost

Inactive Publication Date: 2013-12-18
山西永力实业有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Epoxy asphalt material has long been a mature product in foreign countries. Most of the epoxy asphalt used in my country is still imported from the United States. Its main disadvantages are high price, complicated construction technology, and single product formula, which have affected the quality of epoxy asphalt. Wider applications of asphalt
Although some progress has been made in domestic research on it, overall, the research on epoxy asphalt in my country is still in its infancy. etc. The selection has not been well resolved. According to literature reports, the weight ratio of epoxy resin to asphalt in epoxy asphalt binder and binder is 1:2.8 and 1:2.45, which is far lower than that of imported epoxy asphalt 1:5.85. And the ratio of 1:4.45, so the cost is higher, and the material performance is much lower than that of imported products

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] A kind of preparation method of road and bridge epoxy asphalt is carried out according to the following steps:

[0030] In the first step, the preparation raw materials of epoxy asphalt for road and bridge are proportioned according to the following parts by weight:

[0031] 50 parts of heavy traffic asphalt, 5 parts of dodecenyl succinic anhydride, 10 parts of succinic acid, 10 parts of polyisobutylene succinic anhydride, 10 parts of modified epoxy resin, 0.2 parts of ethylenediamine;

[0032] The raw materials of the modified epoxy resin are composed of the following parts by weight: 5 parts of epoxy resin, 4 parts of furfuryl alcohol mud, 1 part of unsaturated polyester resin, and 1 part of furfuryl alcohol;

[0033] The second step is to prepare modified epoxy resin

[0034] Add 50% of the epoxy resin by weight and the furfuryl alcohol slime and furfuryl alcohol into the reaction kettle, then evacuate to a vacuum degree of 0 to -20KPa, and pass in nitrogen to repla...

Embodiment 2

[0040] A kind of preparation method of road and bridge epoxy asphalt is carried out according to the following steps:

[0041] In the first step, the preparation raw materials of epoxy asphalt for road and bridge are proportioned according to the following parts by weight:

[0042] 60 parts of heavy traffic asphalt, 10 parts of tung oil anhydride, 15 parts of oxalic acid, 15 parts of polyisobutylene succinic anhydride, 20 parts of modified epoxy resin, 0.6 parts of hexamethylene diamine;

[0043] The raw materials of the modified epoxy resin are composed of the following parts by weight: 5 parts of epoxy resin, 4.5 parts of furfuryl alcohol mud, 1 part of unsaturated polyester resin, and 1 part of furfuryl alcohol;

[0044] The second step is to prepare modified epoxy resin

[0045]Add 80% of the epoxy resin by weight and the furfuryl alcohol slime and furfuryl alcohol to the reaction kettle, then vacuumize to a vacuum degree of 0-20KPa, and pass in nitrogen to replace the ai...

Embodiment 3

[0051] A kind of preparation method of road and bridge epoxy asphalt is carried out according to the following steps:

[0052] In the first step, the preparation raw materials of epoxy asphalt for road and bridge are proportioned according to the following parts by weight:

[0053] 80 parts of heavy traffic asphalt, 20 parts of fatty acid anhydride, 25 parts of aliphatic dibasic acid, 18 parts of polyisobutylene succinic anhydride, 30 parts of modified epoxy resin, 1 part of diethylenetriamine; the aliphatic dibasic acid is A mixture of malonic acid and adipic acid in a volume ratio of 2:3;

[0054] The raw materials of the modified epoxy resin are composed according to the following parts by weight: 4 parts of epoxy resin, 6 parts of furfuryl alcohol mud, 1.5 parts of unsaturated polyester resin, and 1.2 parts of furfuryl alcohol;

[0055] The second step is to prepare modified epoxy resin

[0056] Add 40% of the epoxy resin by weight and the furfuryl alcohol slime and furf...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to epoxy asphalt for roads and bridges and a preparation method for the same, which belong to the technical field of modified asphalt for the roads and the bridges, adopt novel modified epoxy resin, and are good in compatibility and large in asphalt filling amount. The technical scheme includes that the epoxy asphalt for the roads and the bridges is made of, by weight, a component A of modified epoxy resin and a component B including 45-85 parts of heavy traffic paving asphalt, 3-25 parts of fatty acid anhydride, 8-30 parts of fatty group binary acid, 1-20 parts of monomer mixtures, 5-40 parts of modified epoxy resin and 0.1-1.2 parts of curing accelerator, the weight part ratio of the component A to the component B is 1:2-12, and the modified epoxy resin is made of, by weight, 3-9 parts of epoxy resin, 2-8 parts of furfuryl alcohol mud, 0.5-3 parts of polyester and 0.5-3 parts of furfuryl alcohol. The epoxy asphalt for the roads and the bridges is widely applied to the field of paving of road surfaces and bridge surfaces.

Description

technical field [0001] The epoxy asphalt for roads and bridges and the preparation method thereof of the invention belong to the technical field of modified asphalts for roads and bridges. Background technique [0002] Epoxy asphalt material has long been a mature product in foreign countries. Most of the epoxy asphalt used in my country is still imported from the United States. Its main disadvantages are high price, complicated construction process and single product formula, which have affected the epoxy wider application of asphalt. Although some progress has been made in domestic research on it, overall, the research on epoxy asphalt in my country is still in its infancy, due to the compatibilizer, curing agent, diluent, accelerator and reinforcing agent etc. The selection has not been well resolved. According to literature reports, the weight ratio of epoxy resin to asphalt in epoxy asphalt binder and binder is 1:2.8 and 1:2.45, which is far lower than that of imported e...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): C08L95/00C08L63/02C08L63/00C08L67/06C08L67/00C08G59/42C08G59/14C04B26/26
Inventor 吴冬建张立宏申俊敏
Owner 山西永力实业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products