Construction Method of Anchor Cable Drilling and Anti-slump Hole
A construction method and technology for preventing slumping holes, which can be used in excavation, infrastructure engineering, sheet pile walls, etc., can solve problems such as poor plasticity, inconvenience, and high soil moisture content, and achieve the effect of reasonable design of construction steps and simple operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see now figure 1 , figure 1 It is a schematic diagram of the positional relationship between the core drill rod and the built-in drill rod according to the embodiment of the present invention. As shown in the figure, the inner drill rod 2 is arranged inside the core drill rod 1 .
[0028] Anchor cable drilling anti-collapse hole construction method of the present invention comprises the following steps:
[0029] a. Foundation pit excavation;
[0030] b. Slope floating soil cleaning, leveling and foundation pit slope setting;
[0031] c. Install conventional drilling machinery and equipment, and use the same drilling machine to carry out the drilling construction of the core drill bit and the built-in drill bit;
[0032] d. Drilling with a core bit, the core bit is hollow, and the drill rod of the core bit is also hollow, with a diameter of 100 mm and a length of 1.0 to 1.2 m;
[0033] e, adopt a built-in drill bit to drill holes, the built-in drill bit is a standar...