Self-propelled underground boring jumbo

A drilling trolley, self-propelled technology, applied in drilling equipment and methods, drilling equipment, earthwork drilling and other directions, can solve the problem of increasing engineering investment and labor intensity, short construction distance of drilling equipment, and great potential safety hazards of scaffolding and other problems, to achieve the effect of reducing repeated installation and handling processes, increasing drilling time, reducing engineering investment and labor intensity

Active Publication Date: 2012-10-10
中国水利水电第七工程局成都水电建设工程有限公司
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, in the domestic water conservancy and hydropower industry, the drilling construction of large-scale water diversion tunnels uses the construction mode of scaffolding and drilling equipment. This mode of construction method involves repeated installation and handling of drilling equipment, and the construction distance of drilling equipment is short. , and continuously set up bent frames, move drilling equipment, lay cables and pipes, dismantle bent frames, etc., which greatly increased the ineffective construction time, thus causing problems such as long construction period, large resource investment and high cost, and scaffolding bent in The tunnel occupies a considerable space, and transport vehicles cannot pass through during drilling construction, causing space interference between drilling operations and transport vehicles, affecting the facilities and other materials required for tunnel construction, and interfering with other processes Serious, resulting in delays in work due to traffic in the tunnel, greatly reducing work efficiency, increasing project investment and labor intensity, resulting in low efficiency, long construction period, and at the same time, the use of scaffolding has great safety hazards, so it cannot be adapted to long-distance, large-size tunnels. Construction requirements, it is necessary to seek advanced, practical and low-cost construction facilities

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Self-propelled underground boring jumbo
  • Self-propelled underground boring jumbo

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] control figure 1 and figure 2 , the present invention provides a self-propelled tunnel drilling trolley, which is composed of a frame 1, a platform 2, an upper platform 17, a transition platform 18, a beam 3, a walking mechanism 4, a cantilever 5, etc., and the frame 1 is an empty stomach Type frame, installed on the walking mechanism 4, the frame 1 is provided with a crossbeam 3, the platform 2 is arranged on the crossbeam 3, the two sides ends of the width direction of the platform 2 are connected on the frame 1 through the bracket 6, on the platform 2, Platform 2 is provided with arc track 16 and cantilever 5 along the two ends of tunnel length direction, and upper platform 17 is arranged on the top of platform 2, and a transition platform 18 is respectively arranged on the top of platform 2, below upper platform 17 left and right, platform 2 two ends Lifting equipment 7 is provided between the booms 5 and below the upper platform 17 .

[0022] The platform 2 is 9...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Heightaaaaaaaaaa
Login to View More

Abstract

The invention provides a self-propelled underground boring jumbo. The jumbo comprises a rack, a platform, an upper platform, transition platforms, a cross beam, a travelling mechanism and cantilevers and the like, wherein the rack is an open-web-type frame and arranged on the travelling mechanism, the cross beam is arranged on the rack, the platform is arranged on the cross beam, the two side end parts of the platform in the width direction thereof are connected to the rack through brackets, an arc orbit and a cantilever are respectively arranged on the platform and at the two ends of the platform along the length direction of a tunnel, the upper platform is arranged above the platform, a transition platform is respectively arranged above the platform and on the left and right sides of the a position below the upper platform, and a hoisting device is arranged between the cantilevers at the two ends of the platform and below the upper platform. The jumbo is reasonable in structure and low in manufacturing cost, and can solve the traffic problem in tunnels, achieve an effect of synchronously carrying out boring, transportation and other operations, reduce the repeated installation of boring equipment and the transportation and removal of framed bents, increase the constructable distance of boring equipment, increase the time of boring operation, greatly improve the operating efficiency, and shorten the construction period.

Description

Technical field: [0001] The invention relates to a self-propelled tunnel drilling trolley, which is mainly used in the technical field of tunnel construction, especially for the drilling operation of long-distance and large-size diversion tunnel construction projects. Background technique: [0002] At present, in the domestic water conservancy and hydropower industry, the drilling construction of large-scale water diversion tunnels uses the construction mode of scaffolding and drilling equipment. This mode of construction method involves repeated installation and handling of drilling equipment, and the construction distance of drilling equipment is short. , and continuously set up bent frames, move drilling equipment, lay cables and pipes, dismantle bent frames, etc., which greatly increased the ineffective construction time, thus causing problems such as long construction period, large resource investment and high cost, and scaffolding bent in The tunnel occupies a consider...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine