Construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring

A technology of excavation relaxation and construction method, which is applied in the direction of excavation, foundation structure engineering, sheet pile wall, etc., can solve the problems of rock mass relaxation and deformation, increase of rock mass water permeability, and decrease of dam safety, so as to achieve convenient implementation , Improve safety and lower construction cost

Active Publication Date: 2012-10-17
POWERCHINA HUADONG ENG COPORATION LTD
View PDF1 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The physical and mechanical properties of the undisturbed rock mass in the high geostress area and the rock mass with primary joints under confining pressure can often meet the requirements of the foundation surface of the dam, but the release of confining pressure stress and blasting vibration caused by excavation is easy to This will lead to relaxation and deformation of the rock mass, and even the formation of horizontal unloading cracks, which will reduce the mechanical indicators such as shear strength and deformation modulus of the rock mass within the affected area, increase the water permeability of the rock mass, and seriously affect the foundation rock of the dam. body mass, reducing the safety of the dam

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring
  • Construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring
  • Construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] like Figure 1~Figure 4 As shown, this embodiment is a construction method that uses prestressed anchorage to control the excavation relaxation of the dam foundation rock mass, which reduces the impact of excavation relief stress unloading relaxation on the quality of the foundation rock mass, and improves the safety of the dam. The main feature of this embodiment is that: before the excavation of the foundation surface 1 of the dam, prestressed anchorage is carried out to generate prestress on the foundation rock mass 8 .

[0018] The concrete construction method of this embodiment is as follows:

[0019] a. First, during the excavation and construction of the dam foundation, a protective layer 2 with a thickness of 2~4m is reserved above the design elevation adjacent to the foundation surface 1.

[0020] b. Then drill an anchor hole 3 on the top surface of the protective layer 2. The anchor hole 3 goes deep below the foundation surface 1, and a detachable prestressed...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring. The invention aims at providing a construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring so as to reduce the effect of excavation stress relief unloading relaxation on the dam foundation rock mass quality and improve the safety of the dam, the construction method is convenient to execute, and the construction cost is low. The technical scheme of the invention is as follows: the construction method of controlling dam foundation rock mass excavation relaxation through prestress anchoring is characterized by comprising the following steps of: a. performing dam foundation excavation construction and preserving a protection layer above a foundation base; b. drilling anchor rod holes on the top face of the protection layer, arranging detachable prestress anchor rods in the holes and applying prestresss on the anchor rods; c. injecting anchoring mortar in the anchor rod holes below the protection layer; d. detaching the connecting rods in the protection layer after the anchoring mortar is solidified; and e. finally excavating the protection layer. The construction method provided by the invention is suitable for foundation excavation construction of easily relaxed rock mass in hydraulic and hydroelectric engineering.

Description

technical field [0001] The invention relates to a construction method for controlling the excavation relaxation of dam foundation rock mass by adopting prestressed anchorage. It is suitable for foundation excavation construction where the rock mass is easy to relax in water conservancy and hydropower projects. Background technique [0002] With the development of the national economy, a large number of water conservancy and hydropower projects need to be built in the west of my country. These projects often encounter complex geological conditions, such as high ground stress and the development of primary joints and fissures in the rock mass. The physical and mechanical properties of the undisturbed rock mass in the high geostress area and the rock mass with primary joints under confining pressure can often meet the requirements of the foundation surface of the dam, but the release of confining pressure stress and blasting vibration caused by excavation is easy to This will ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/74E02D17/02
Inventor 赖道平徐建荣何明杰
Owner POWERCHINA HUADONG ENG COPORATION LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More