Rope length control equipment, method and system of super-lifting device as well as engineering machine
A technology of super-lifting device and control equipment, applied in cranes and other directions, can solve the problems of inaccurate work, excessively long rope, and inaccurate control of construction machinery, so as to achieve stable work and avoid the effect of being too long or too short.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0025] The construction machinery provided by the present invention is described by taking a telescopic boom crane with a super-lifting device as an example, but it is not limited thereto. figure 1 It is a schematic diagram of the structure of the crane including the compensation mechanism. The structure of the crane is as figure 1 As shown, it mainly includes a pulley block 1, a steel wire rope 2, a compensation mechanism 3 (the compensation mechanism can be an elastic element that can be contracted under load such as an oil cylinder, a spring), a superlift mast 4, a rear tensioning device 5, and a basic arm 6 , turntable 7, luffing oil cylinder 8, super hois...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 