Rock stratum double initial support layering method for establishing large-scale underground structure

An underground structure, large-scale technology, applied in underground chambers, earth-moving drilling, wellbore lining and other directions, can solve the problems of increased engineering volume, difficulty, harsh construction environment, etc., to save engineering cost, convenient construction organization, and construction efficiency. high effect

Inactive Publication Date: 2012-10-31
CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF7 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Among them, the side hole method is to construct the two side pilot tunnels first, and requires synchronization, and then construct the middle pilot tunnel. The disadvantage of this construction method is that there are many blocks, many processes, and the greatest disturbance to the ground; the middle tunnel method is that the middle pilot tunnel is carried out first. In construction, the beam and column support system is established, and then the side pilot tunnel is constructed. The disadvantage of this construction method is that there are many blocks, and the excavation of the side pilot tunnel after the middle pilot tunnel is formed is easy to form unbalanced thrust, and the formation is disturbed many times, but The first established beam-column system plays a certain role in controlling land subsidence; the PBA method uses small pilot holes to build piles and beams to form the main force-transmitting structure, and excavates the inner pit under the protection of the arch. However, in order to form the arch cover, in addition to the central column and the upper and lower pilot tunnels, the surrounding side piles, the pile-forming pilot tunnels, and the backfilling of the primary support in the pilot tunnels must also be installed, which increases the cost. Unnecessary amount of engineering, in addition, this construction method also has the disadvantage of relatively harsh construction environment
In addition, in the construction of submerged large-section subway stations or tunnels in rock formations, each construction method has certain adaptability. It is difficult to construct hole-digging piles in small pilot tunnels during PBA construction, and blasting operations are required to form holes. , while the traditional middle hole method and side hole method are difficult to retain the support of the upper layer when the lower layer is blasted

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rock stratum double initial support layering method for establishing large-scale underground structure
  • Rock stratum double initial support layering method for establishing large-scale underground structure
  • Rock stratum double initial support layering method for establishing large-scale underground structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041]The method for constructing a large-scale underground structure by the double-primary branch layering method of the rock formation provided by the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0042] The arch part of the large-scale underground structure provided by the present invention is in the form of a large-span single arch, and the lower part is in the form of a single-column straight side wall, and a large-span subway station is taken as an example for illustration.

[0043] Such as Figure 1-Figure 7 Shown, the method for building large-scale underground structures by rock strata double initial support delamination method provided by the invention comprises the following steps carried out in order:

[0044] 1) First, construct the inclined shaft 27 on one side of the large-scale underground structure to be excavated, use the inclined shaft 27 as the construction cross passage, open t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A rock stratum double initial support layering method for establishing a large-scale underground structure mainly includes the following steps: excavating the side headings of an arch part, excavating the upper steps on the middle heading of the arch part, setting the double-layer initial supports of the arch part, setting a mud jacking steel pipe, setting an arch springing girder, excavating the lower steps on the middle heading of the arch part, and three-layered excavating the foundation under the middle heading of the arch part and the two side headings of the arch part. The rock stratum double initial support layering method for establishing the large-scale underground structure combines multiple technologies as advanced small pipe, big pipe shed and section steel support with multiple mining excavation technologies such as PBA method, side drifts-support method, CRD method and step method, not only can satisfactorily control the structural deformation and the stratum settlement, but also has the advantages of simple process, convenience for construction and organization, high construction efficiency, saved project cost and the like.

Description

technical field [0001] The invention belongs to the technical field of tunnel and underground engineering design and construction, and in particular relates to a construction method for constructing large-scale underground structures such as shallow-buried underground excavation large-section single-arch subway stations or tunnels by adopting a double-primary layering method. Background technique [0002] With the development of my country's social economy, many large and medium-sized cities in China have started large-scale subway construction and underground space development. Due to different geological conditions, the structural forms and construction methods of subway stations are quite different, resulting in the diversity of structural forms and construction methods in my country's underground space construction. [0003] In densely populated urban areas, in order to meet the use functions of underground spaces such as subway stations and provide passengers with spaci...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/00E21D11/10E21D11/38E21F16/02
Inventor 张先锋宋超业熊田芳许俊峰徐福东宋仪张美琴王宁彭柳松杨超峰李国清王蓉蓉朱宝玲韩涛
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products