Construction method of a precipitation well
A construction method and technology for dewatering wells, which are applied in infrastructure engineering, construction, sheet pile walls, etc., can solve problems such as high environmental pressure, scrapped wellbore, and difficulty in flushing, to prevent the influx of silt, and to reduce the number of auxiliary workers. The effect of labor cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0032] refer to figure 1 and figure 2 , a construction method of a dewatering well, comprising the following steps:
[0033] (1) Positioning and stakeout
[0034] Use the GPS positioning system or other measurement and positioning methods combined with the stakeout coordinates of the design drawings to stake out and insert flags for identification, and then place tapered pipe boots on the corresponding positions of the sample points;
[0035] (2) Setting up casing
[0036] Use a crane to lift the hydraulic vibratory hammer, the vibratory hammer clamps the casing, inserts the casing into the conical pipe shoe on the stakeout point, and is fixedly connected by the steel hoop of the conical pipe shoe, and then opens the vibratory hammer to conn...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com