CRS power confirming method and equipment

A technology for determining the method and power, applied in the field of communication, can solve the problems such as the user throughput that cannot be improved by beamforming, the RE power is not improved, the MIMO mode is not improved, etc., so as to improve user experience, maintain throughput, and improve downlink. The effect of signal quality

Active Publication Date: 2013-09-04
DATANG MOBILE COMM EQUIP CO LTD
View PDF3 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] According to the protocol, the four kinds of ρ B /ρ A ratio, such as Figure 5 As shown, for these four different ρ B /ρ A Schematic diagram of the RE power under the configuration, from Figure 5 It can be seen that only the RE power in the symbols containing CRS REs has changed. Although this scheme improves the coverage of the cell, for edge users, the MIMO (Multiple-Input Multiple-Output, Multiple-Input Multiple-Output) method It has been adaptive to beamforming, and the demodulation of beamforming depends on the user-specific reference signal URS; by comparing with the time-frequency position of CRS, it can be seen that the URS of port5 or port7/port8 is located in OFDM symbols that do not contain CRS

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • CRS power confirming method and equipment
  • CRS power confirming method and equipment
  • CRS power confirming method and equipment

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0034] Example one

[0035] In view of the problems existing in the prior art, combined with the ICIC principle, the first embodiment of the present invention provides a method for determining CRS power, such as Image 6 As shown, the method includes the following steps:

[0036] Step 601: Determine the CRS power corresponding to the cell. For example, when setting all the CRS powers of the entire cell as power A, the CRS power corresponding to the cell can be directly determined as power A.

[0037] In a specific implementation of the embodiment of the present invention, the network side equipment (such as base station equipment) also needs to broadcast the CRS power corresponding to the cell through a SIB (System Information Block) message, so that each UE can obtain The CRS power corresponding to this cell.

[0038] Step 602: Determine the location of the first PRB (which can be called P center ), the second PRB location for scheduling edge users of the cell (may be called P edg...

Example Embodiment

[0063] Example two

[0064] Based on the same inventive concept as the above method, an embodiment of the present invention also provides a device for determining the CRS power of a cell reference signal, such as Figure 8 As shown, the equipment includes:

[0065] The first determining module 11 is configured to determine the CRS power corresponding to the cell;

[0066] The second determining module 12 is configured to determine the first physical resource block PRB location for scheduling the central user of the cell and the second PRB location for scheduling the edge user of the cell;

[0067] The third determining module 13 is configured to determine that the CRS power of the first PRB location is the CRS power corresponding to the cell minus a preset first power, and determine that the CRS power of the second PRB location corresponds to the cell The CRS power of plus the preset second power;

[0068] Wherein, the first power is greater than zero, and the second power is greater t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a CRS power confirming method and equipment. The method includes conforming the CRS power of a corresponding cell; confirming a first PRB position for scheduling of a center user of the cell and a second PRB position for scheduling of an edge user of the cell; confirming that the CRS power of the first PRB position is obtained after the CRS power corresponding to the cell subtracts first preset power; confirming that CRS power of the second PRB position is obtained after the CRS power corresponding to the cell adds second preset power. The CRS power of different frequency domain positions is set separately, on the premise that emission performance of an RRU is not influenced, the emission power of information scheduling of the cell is guaranteed, coverage of the cell is improved, the power of a URS, the power of a PDCCH and the power of a PDSCH of beamforming users on the edge of the cell are improved, improvement of downlink signal quality of the beamforming users is benefited, frequency spectrum efficiency of the edge of the cell is improved, and meanwhile throughput capacity of a whole system is maintained.

Description

Technical field [0001] The present invention relates to the field of communication technology, and in particular to a method and equipment for determining CRS power. Background technique [0002] In the LTE (Long Term Evolution) system, the downlink uses OFDM (Orthogonal Frequency Division Multiplexing, Orthogonal Frequency Division Multiplexing) technology. In terms of resource division, there are PRB (Physical Resource Block) and RE (Resource Element resource unit) and OFDM symbols. Such as figure 1 As shown, it is a schematic diagram of downlink physical resources. Taking the most commonly used 20M LTE cell bandwidth as an example, a PRB is defined as 0.5ms in the time domain and 180KHz in the frequency domain. figure 1 The middle is marked with a thick box; an RE is defined as 15KHz in the time domain (the interval of each OFDM symbol), and the length of an OFDM symbol in the frequency domain. figure 1 The area indicated by the middle arrow; the number of OFDM symbols in a sl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04W52/34H04W72/12
Inventor 杜红飞
Owner DATANG MOBILE COMM EQUIP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products