Filling and reinforcing method for floor roadway cross-layer pressure-relief borehole
A technology of layer penetration and rock roadway, which is applied in the field of floor rock roadway pressure relief drilling filling and reinforcement, which can solve the problems of restricting safe and efficient mining of a single soft high outburst coal seam, uneven stress distribution of coal seam, and difficulties in coal roadway support. , to achieve wide practicability, improve the strength of coal body, and improve the effect of supporting conditions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] The present invention will be further described below in conjunction with the embodiment in the accompanying drawings:
[0014] The filling reinforcement method of the floor rock roadway through the layer pressure relief drilling of the present invention: firstly, in the floor rock roadway drilling site, the common drilling is constructed in the coal seam 1 according to the routine, and then the pressure relief and permeability enhancement measures are adopted in the coal seam 1 through the common drilling Part of the coal body is discharged to form the pressure relief borehole 3 through layers. Wrap 2-4 polyurethane sealing bags 7 with adhesive tape at a distance of 5-6m from the orifice 5 of the gas drainage pipe 5 fed into the pressure relief borehole 3, where the polyurethane sealing bag 7 should be separated from the gas drainage The front end of the pipe 5 is not less than 5m; at the same time, the grouting pipe 8 is fixed at the lower part of the gas drainage pip...