Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode

A technology of positioning installation, cover-excavation and reverse operation, which is applied to underwater structures, water conservancy projects, artificial islands, etc. It can solve the problems that the intermediate piles and ground connection walls cannot be constructed at the same time, and affect the normal construction of the structure, so as to ensure the construction quality, speed up construction, and ensure structural safety

Active Publication Date: 2015-07-01
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the influence of the above-ground environment, underground transportation projects are increasingly adopting the cover-excavation process. During the construction process of the deep foundation pit with the cover-excavation process, when the enclosure structure adopts the form of an underground diaphragm wall, the two adjacent structures When the middle piles of the vertical support structure and the ground connection wall are occluded or overlapped, the middle piles and the ground connection wall cannot be constructed at the same time, which will affect the normal construction of the structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode
  • Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode
  • Method for installing steel pipe column under cover and excavation top-down method in segmental-locating mode

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] Cooperate with reference figure 1 As shown, the segmental positioning and installation method of the steel pipe column after the cover digging and reverse operation of the present invention comprises the following steps:

[0018] S1) Construct the underground diaphragm wall, complete the enclosure structure and insert lattice columns as a temporary vertical support structure, and excavate the earthwork to the design depth after meeting the excavation requirements;

[0019] S2) According to the headroom height of the negative floor, the steel pipe column is divided into a top steel pipe column, a bottom steel pipe column and a plurality of middle section steel pipe columns;

[0020] S3) The steel pipe column is installed by section positioning, and the construction of the steel pipe column at the top is completed first, and then the construction of the steel pipe column at the bottom is completed;

[0021] During the construction of the top steel pipe column, according ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for installing a steel pipe column under the cover and excavation top-down method in a segmental-locating mode. The method comprises the following steps that 1) an underground continuous wall is constructed and a temporary support is arranged, and earthwork is excavated to a preset elevation; 2) the steel pipe column is divided into a top steel pipe column, a bottom steel pipe column and a plurality of middle segment steel pipe columns according to the height of the headroom of the negative one-story; 3) the steel pipe column is installed in the segmental-locating mode, construction of the top steel pipe column is firstly finished, and then construction of the bottom steel pipe column is finished; 4) the first segment of the middle segment steel pipe columns is fixedly connected with the bottom steel pipe column, the rest of the middle segment steel pipe columns are fixedly connected in sequence from bottom to top, and the last segment of the middle segment steel pipe columns is fixedly connected with the top steel pipe column; 5) concrete is poured in the steel pipe column, the temporary support is detached, and construction is finished. Through segmental-locating installation of the steel pipe column, the construction problem of conflict of a building envelop and the vertical support is solved, construction quality is guaranteed, structure safety is guaranteed, and meanwhile construction speed is quickened.

Description

technical field [0001] The invention relates to a construction method for a steel pipe column, in particular to a construction method for erecting a steel pipe column after a cover-excavation process for deep foundation pit engineering. Background technique [0002] With the rapid development of urban underground engineering, deep foundation pit engineering is also developing in the direction of ultra-deep, ultra-large, complex, and multi-form. The construction technology is becoming more and more complicated and the construction difficulty is gradually increasing. Due to the influence of the above-ground environment, underground transportation projects are increasingly adopting the cover-excavation process. During the construction process of the deep foundation pit with the cover-excavation process, when the enclosure structure adopts the form of an underground diaphragm wall, the two adjacent structures When the middle piles of the vertical support structure and the ground...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/045
Inventor 王跃飞郭凯亓立刚崔爱珍位英超
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More