A double-row pile-beam vertical anchor support system and its construction method
A double-row pile and system technology, applied in excavation, sheet pile wall, foundation structure engineering and other directions, can solve the problems of complicated procedures, poor supporting effect, complicated construction, etc., to simplify the procedure, reduce the occupied underground space, The effect of shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] Examples see Figure 1-3 As shown, this double-row pile beam vertical anchor support system includes a front row of slope protection piles 1 located on the side slope of the foundation pit 1 and a stable ground 8 located outside the foundation pit (that is, located in the front row of slope protection piles 1 and existing building In the stable ground 8 between the foundation 7 or the red line area, underground obstacles, etc.) the rear slope protection piles 9 and the connecting beams 2 connected between the pile tops of the front slope protection piles and the rear slope protection piles.
[0029] The connecting beams are lattice beams, consisting of a front-row pile top beam 2.1 rigidly connected to the top of the front slope protection piles, a rear-row pile top crown beam 2.2 rigidly connected to the top of the rear slope protection piles, and a rear-row pile. The anchor connecting beam 2.3, which is outside the top crown beam and is relatively parallel to the top cro...
PUM