Heating furnace burner block replacing method capable of reserving furnace top
A replacement method and heating furnace technology, applied in the direction of lining repair, etc., can solve the problems of long construction period, delay in normal production, disturbance of furnace top refractory materials, etc., and achieve the effect of shortening construction period, simple method and fast construction speed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0024] Such as figure 1 , image 3 and Figure 4 As shown, the heating furnace burner brick replacement method of the present invention retaining the roof, the heating furnace includes a hermetically sealed furnace wall 1, a furnace roof 2 and a furnace bottom 3, a furnace shell 4 is arranged on the outside of the furnace wall 1, and the furnace The shell 4 is provided with a heat storage box 5, and the furnace wall 1 is provided with a burner brick 6 installed on the opening of the heat storage box 5, and the burner brick 6 communicates with the inside of the heating furnace; including the following steps:
[0025] A. Remove the old furnace wall and old burner bricks;
[0026] B. Carrier 7 and hoisting equipment are arranged in the heating furnace, and a slideway 8 leading into the heating furnace from the outside of the heating furnace is arranged ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 