A technology for self-anchored suspension bridges and box girders, which is applied in bridge construction, bridges, erection/assembly bridges, etc., can solve problems such as increasing construction risks and costs, reducing the speed of jacking construction, increasing complex deviation correction work, etc., to achieve improved Effects of construction efficiency and quality, reduction of engineering quantity and reduction of construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Use the above-mentioned construction method to design the pulling erection method of the main tower as the box girder to erect the box girder. The steps are as follows:
[0030] 1) Small-span self-anchored suspension bridges adopt one-way pull (main span ≤ 250m)
[0031] Step 1: Construction of various temporary support structures (temporary buttresses, welded and assembled platforms, temporary steel pipes, etc.) and sliding devices, deviation correction and guiding devices, single-row traction and anchoring facilities where traction jacks are arranged in one direction at the beam of the main tower;
[0032] Step 3: The guide beam and several sections of the box girder are assembled, and the traction steel strand is installed to carry out the pulling construction of the box girder;
[0033] Step 3: Continue to assemble the box girder segments, adjust and then carry out pulling construction;
[0034] Step 4: Repeat step 3. When the guide beam penetrates the center line ...