Unlock instant, AI-driven research and patent intelligence for your innovation.

A Method for Economic Switching and Switching Scheduling of Transformer in Residential Area

A scheduling method and transformer technology, applied in the direction of single-network parallel feeding arrangement, etc., can solve problems such as practical difficulties, damage to power equipment, safety estimation, online safety verification, and correction switching methods. The calculation amount is insufficient to meet industrial applications. , to achieve the effect of ensuring safety and satisfying safety

Active Publication Date: 2016-08-24
STATE GRID CORP OF CHINA +3
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] This type of method is based on the prediction of the future daily load curve, which can theoretically enable the economical operation of the transformer, but there are two major difficulties in practice
First, frequent switching will accelerate the damage of power equipment
Second, the change time is irregular, which reduces the reliability of power supply
The existing methods are not enough to meet the needs of industrial applications in terms of safety prediction, switching time and combination mode optimization, online safety verification and correction, and switching method calculations in the process of making switching scheduling.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Method for Economic Switching and Switching Scheduling of Transformer in Residential Area
  • A Method for Economic Switching and Switching Scheduling of Transformer in Residential Area
  • A Method for Economic Switching and Switching Scheduling of Transformer in Residential Area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be specifically introduced below in conjunction with the accompanying drawings and specific embodiments.

[0033] refer to figure 1 As shown, the present invention is an economic switching scheduling method for transformers in residential areas, which is characterized in that according to load forecasting, the transformer capacity constraints are first considered, and then the optimal path selection is used to synthesize the economic benefits of power saving, transformer switching times and density constraints Optimized to obtain the transformer switching date and the combination method that should be adopted in the future dispatching period. The method includes rolling safety check and correction steps to meet the safety of transformer operation under the condition of short-term sudden change of load.

[0034] A kind of sub-district transformer economic switching dispatching method of the present invention comprises the following steps:

[...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a district transformer economic switching scheduling method. The method is characterized by comprising the following steps: step 1, reading district transformer parameters and parallel modes; step 2, according to load prediction, obtaining a peak load; step 3, calculating an available mode of the peak load; step 4, forming an available sequence set; step 5, forming a frequency optimization sequence set; step 6, applying optimal path selection to select an optimal sequence; step 7, according to the load prediction, updating peak loads in the following two days in a rolling mode; and step 8, examining the safety of a corresponding two-day combination mode in the economic optimal sequence in a rolling mode by use of updated peak loads of the following two days. The method provided by the invention can simultaneously arrange district transformer switching time of the following seven days and corresponding combination modes, realizes economic switching scheduling of a district transformer, can satisfy safe operation of the transformer, at the same time controls the transformer switching frequency and density, and accords with the scheduling operation practice of a district transformer station.

Description

technical field [0001] The invention relates to a switching scheduling method, in particular to a community transformer economic switching scheduling method, and belongs to the technical field of distribution transformer operation. Background technique [0002] With the advancement of urbanization in China, the importance of community distribution substations in the power system has gradually increased. In order to improve the reliability of residents' power supply and respond to the country's requirements for energy conservation and emission reduction, the economic operation of distribution transformers has attracted more and more attention. However, due to the different energy efficiency levels of transformers currently in use in China's power distribution system, and the large differences in the utilization rate of installed capacity of substations in various communities, the economic benefits of substations in communities need to be further improved. [0003] The classi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/38
Inventor 翟学锋刘忠李澄谢林枫王红星殷俊王秋军杨川郑海雁吕辉
Owner STATE GRID CORP OF CHINA