Unlock instant, AI-driven research and patent intelligence for your innovation.

Cable-stayed anchorage system of cable-stayed fabricated highway steel bridge

A cable-stayed anchor and prefabricated technology, used in bridges, bridge parts, bridge construction, etc., can solve the problems of long erection time, troublesome cable adjustment, and inability to meet the needs of emergency rescue and rapid erection, reducing anchorage force and simplifying And the effect of easy installation, shortened installation and tensioning time

Inactive Publication Date: 2015-09-02
ZHEJIANG SCI RES INST OF TRANSPORT +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The feature is that the span of the bridge is increased through the cable system. The cable tower of the conventional cable-stayed bridge needs to be connected with the foundation with a permanent concrete deep foundation. The beam is anchored on the base, so the erection time is quite long, and the cable adjustment is very troublesome, which cannot meet the rapid erection requirements of emergency rescue

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cable-stayed anchorage system of cable-stayed fabricated highway steel bridge
  • Cable-stayed anchorage system of cable-stayed fabricated highway steel bridge
  • Cable-stayed anchorage system of cable-stayed fabricated highway steel bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0037] Embodiment: A cable-stayed assembled steel bridge cable anchorage system (see attached figure 1 ), the ZB-200 prefabricated highway steel bridge is used as the main girder 1, and the center of the main girder 1 is vertically consolidated with a cable tower 2, and the cable tower is assembled from a "321" type truss. The steel bridge adopts a two-span self-balancing single-cable tower and double-cable plane structure. The main girder has two spans, namely the suspended river span across the river and the land span supported on the land. The anchor system forms a suspended river span anchor system and a land span anchorage system. system. There is a three-point cable-stayed cable system connected between the cable tower and the main girder, and the anchorage systems of the suspended river span and the land span are arranged symmetrically. Anchoring member 3 on the tower of 2 and six anchoring members 8 on the beam connecting the lower end of the stay cable and the main b...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a stay cable anchor system of a cable-stayed assembly type road steel bridge. A two-span self-balancing single-cable-bent-tower double cable plane structure is adopted for the steel bridge, and a main beam is provided with a river suspension span and a land span, on-tower anchor components are arranged on a cable tower, and a one-division-several stay cable system is connected between the cable tower and the main beam. Stay cables on the two sides of the cable tower are symmetrically arranged, and single-lug-type anchorage devices are adopted for the anchorage ends on the stay cable tower and directly anchored on webs of the anchor components on the tower in a pin joint mode. On-beam detachable anchor components are adopted for stay cables and located at the intersecting positions between truss vertical web members and upper chords, and the on-beam anchor components are of a rotatable structure. The single-lug-type anchorage devices are adopted for the anchorage ends on the stay cable tower and can be directly anchored on the webs in the pin joint mode. The stay cable anchor system is simple in structure and easy and convenient to splice and construct; the one-division-several stay cable system disperses anchorage points on the main beam, anchorage force on the main beam of the stay cables is effectively reduced, meanwhile, elastic supporting points of the main beam are densified, the practical span of the main beam is shortened, and the stress state of truss pieces is improved.

Description

technical field [0001] The invention relates to an anchoring system of a cable-stayed bridge, in particular to a cable-stayed assembly type cable-stayed cable anchoring system of a highway steel bridge capable of rapid installation and tensioning. Background technique [0002] The prefabricated highway steel bridge is a standard bridge that can be disassembled and can be erected quickly. be widely used. Especially at the critical juncture of emergency rescue and when time becomes the key factor, the prefabricated highway steel bridge plays a very important role. [0003] With the rapid development of my country's highway construction, especially the comprehensive construction of national expressways, long-span (single-span ≥ 70m) highway bridges are becoming more and more popular. These bridges will be damaged due to natural disasters such as earthquakes, flash floods, mudslides, or people's daily traffic activities, resulting in traffic interruption. In order to ensure t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D19/14
Inventor 邵吉林戴建锋曾航初陆耀忠方龙飞秦现德陈建华田浩赵伟程临军
Owner ZHEJIANG SCI RES INST OF TRANSPORT