A technology of concrete beams and construction methods, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of high cost of ordinary uplift piles, affecting the durability of piles, and cracks in piles, and achieves a significant comprehensive technical economy and social benefits, reduce investment costs, and reduce project cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Specific steps include:
[0017] 1) Construction preparation;
[0018] A. Before construction, the construction personnel must be familiar with the requirements of the drawings, prepare a special prestressed construction plan, and implement it after expert demonstration, accurately calculate the actual length of the steel strands in the components, carefully count the number of various anchor fixtures and spiral bars, and purchase Or design and draw the processing drawing of the bearing plate and the summary table of the prestressed engineering quantity by ourselves, and make technical disclosure to the operator;
[0019] B. Before the prestressed tendon enters the site and is suitable for use, in addition to routinely checking its certificate of conformity, it is also necessary to retest its physical properties by sampling, and its tensile strength, yield strength, elongation and cross-sectional area must meet the requirements; each acceptance batch The weight of the ...
PUM
Login to View More Abstract