Integral type self-gravity water-stop steel pouring jacket for wet method installation of prefabricated piers and abutments
A prefabricated abutment, integral technology, applied in construction, infrastructure engineering and other directions, can solve the problems of high cost, high cost, long construction period, etc., and achieve the effect of easy assembly and disassembly, good water-stop effect, and reduced construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] As shown in Figures 1, 2, 4 and 5, the integral water-tight casing of the present invention includes a casing 1 of an integral structure, the casing 1 is integrally hoisted and installed on the prefabricated platform 6, and the inner wall of the casing 1 is provided with There is a wrap-around corbel 2, under the wrap-around corbel 2 is fixed a circle of pressure beam 3 surrounding the inner wall of the casing, under the pressure beam 3 is installed a circle of rubber waterstop 4 surrounding the inner wall of the casing; on the inner wall of casing 1 A number of inner support cross bars 5 are arranged between the prefabricated pier body 7 . In this embodiment, the casing 1 is integrally hoisted and installed on the prefabricated platform 6 . A pre-tensioning device 8 is also provided between the bottom of the casing 1 and the prefabricated cap 6, and the pre-tensioning device 8 includes a prefabricated cap bracket 81 and a connecting bolt 82 arranged on the top surface ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 