Simulation testing device and method for multidirectional alternating load of wind power transmission system

A transmission system and alternating load technology, which is applied in the field of multi-directional alternating load simulation test device, can solve the problem of being unable to simulate various types and multi-directional loads of the main torque, failing to meet design and manufacturing, scientific research on structural performance, and limitations Accuracy and usability of wind power transmission system to achieve the effect of enhancing load simulation capability

Inactive Publication Date: 2014-09-17
TSINGHUA UNIV
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, most of the commonly used wind power transmission chain simulation experiment devices can only load the main torsional load, and cannot simulate various types and multi-directional loads other than the main torque—including the axial impact of the impeller on the transmission chain under the action of wind load, and The particularly prominent horizontal and vertical bending moments in the process of yaw and pitch are far from meeting the requirements of in-depth design and manufacturing and scientific research on structural performance, which greatly limits the experimental research and development of wind power transmission systems. The accuracy and usability of its relevant research results

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Simulation testing device and method for multidirectional alternating load of wind power transmission system
  • Simulation testing device and method for multidirectional alternating load of wind power transmission system
  • Simulation testing device and method for multidirectional alternating load of wind power transmission system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0022] Such as figure 1 and figure 2 As shown, a multi-directional alternating load simulation test device for a wind power transmission system of the present invention includes six controllable telescopic actuating arms 3 installed in two groups of three on the base frame 1 One end of the two groups of actuating arms 3 is respectively connected to the support 2 fixed on the base frame 1 in a spherical hinged manner, and the other end is also connected to the front bearing seat 4 and the rear bearing seat of the main shaft in a spherical hinged manner. 6 solid connection, the two ends of the main transmission shaft 5 are respectively fixed on the front bearing housing 4 and the rear bearing housing 6 through bearings, and one end of the main transmission shaft 5 is connected to the multi-directional alternating load simulation test ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a simulation testing device and method for the multidirectional alternating load of a wind power transmission system. The simulation testing device for the multidirectional alternating load of the wind power transmission system comprises six controllable telescopic actuation arms, wherein the six controllable telescopic actuation arms are installed on a fundamental rack in the mode that the six controllable telescopic actuation arms are evenly divided into two groups, one end of each actuation arm is fixedly connected with a support in a spherically hinged mode, the support is fixed to the fundamental rack, the other ends of one group of actuation arms are fixedly connected with a front bearing seat of a main transmission shaft in a spherically hinged mode, and the other ends of the other group of actuation arms are fixedly connected with a rear bearing seat of the main transmission shaft in a spherically hinged mode. One end of the main transmission shaft is connected with a main motor providing the main torque, and the other end of the main transmission shaft is connected with a step-up gear box for a test. The simulation testing device for the multidirectional alternating load of the wind power transmission system further comprises a central control unit connected with the main motor and the six actuation arms. An input simulated load comprises a main torque load and a main rotation and non-torsion load. After the simulated load is input into the central control unit, the central control unit sends orders of execution action and action force to the main drive motor and the six actuation arms so that multidirectional alternating load simulating loading of the wind power transmission system can be achieved. By the adoption of the simulation testing device and method for the multidirectional alternating load of the wind power transmission system, the actual torsion, the actual impact and the actual bending load borne by a transmission chain of a wind power generating device installed high above the ground can be simulated completely.

Description

technical field [0001] The invention relates to the technical field of wind power generation equipment transmission systems, in particular to a multi-directional alternating load simulation test device and method for wind power transmission systems. Background technique [0002] In order to deeply study the influence mechanism of the structural design and manufacturing parameters of the key components of the wind power transmission chain on its reliability, it is necessary to carry out experimental research on the performance of the wind power transmission chain under complex load conditions. Due to the particularity of the installation and operation of wind power generation equipment, it is very difficult to carry out the operation test of the wind power transmission system under real working conditions in the high-altitude field. Therefore, the laboratory-level wind power transmission chain simulation test is the main technical means of the current scientific research on t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01M13/02
Inventor 王辉贾迈勒阿里李晓龙向东融亦鸣
Owner TSINGHUA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products