A gis bus duct partition maintenance method
A technology of bus bars and conduits, applied in switchgear, electrical components, etc., can solve problems such as social negative impacts and economic losses, expand the scope of urban and rural power outages, and affect the quality of power supply, so as to save power resource costs, save maintenance time, optimize The effect of maintenance methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050]Firstly, the power equipment in operation is monitored by means of partial discharge monitoring or gas monitoring. After the flashover point is determined in advance according to the comprehensive evaluation, further for the connection bellows, combined with the actual operation section, the comprehensive evaluation is better for all parties. break point (specifically: for multiple corrugated pipes on one bus, according to the setting position of the corrugated pipes and the connection relationship of peripheral auxiliary equipment, such as disconnectors, circuit breakers, etc. Comprehensive evaluation of equipment damage minimization), implement maintenance and isolation operations for this point, specifically: firstly, carry out gas recovery operations for the GIS in the accident section, and secondly, remove the bellows at the breaking point of this section and its surrounding adjacent components (Specifically: connecting conductors and contacts connected to the inside...
Embodiment 2
[0053] Firstly, through the detection and checking of the oscillogram (the oscillogram is the fault oscillogram, which displays the waveforms of the faulty line, busbar and adjacent lines that are electrically connected to the faulty line through the networked system of the oscilloscope), the flash is diagnosed. Then, with the operation of Example 1, the best corrugated pipe breaking point is comprehensively evaluated according to the conditions of all parties, and the maintenance and isolation operation is carried out for this point, specifically: first, the gas recovery operation is carried out for the GIS of the accident section, and secondly, Remove the bellows at the breaking point of this section and its surrounding adjacent parts (specifically: connecting conductors and contacts connected to the inside of the busbar), and secondly, install end assembly and seal on the normal section of the busbar air chamber that is not within the scope of maintenance. Cover, put into op...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com