Construction method and device for hoisting of heavy and large part of vertical ship lift

A vertical ship lift and hoisting device technology, which is applied to vertically lift ship machinery, ship lifting devices, buildings, etc., can solve problems such as difficult hoisting, large hoisting safety hazards, and long hoisting time, so as to reduce structural impact and save energy. The effect of investment and time saving

Active Publication Date: 2014-10-29
CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF2 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This scheme is a simple hoisting scheme, but the side wall where the electric hoist is buried needs to be temporarily reinforced during the construction process. At the same

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method and device for hoisting of heavy and large part of vertical ship lift
  • Construction method and device for hoisting of heavy and large part of vertical ship lift
  • Construction method and device for hoisting of heavy and large part of vertical ship lift

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] look figure 1 , and combined with figure 2 , the present invention is used to transfer and hoist the ship-carrying box 8 from the top of the dam-passing channel 12 to the ship-carrying box tooling platform 11 of the body section 6. The ship-carrying box 8 is usually provided with longitudinal beams or beams, and the dam-passing channel 12 is located at the barrier The upper part of the water building, and the ship-holding box tooling platform 11 is located at the bottom of the body section 6 of the downstream side of the water-retaining structure. There is a water level difference between the two, which cannot be directly navigated. The hoisting and transshipment of heavy items between them. It can be seen from the figure that the ship-holding box tooling platform 11 is located behind the downstream working gate 9 , that is, the upstream surface, and the downstream working gate 9 is provided with a lower gate head 7 . The present invention is provided with the trans...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method and a device for hoisting of a heavy and large part of a vertical ship lift, a transport platform (1) for carrying a platform trailer (2) is arranged on the crest level of both sides of an upstream dam-passing channel (12) of the vertical ship lift, walking tracks (5) are arranged on wall structures of both sides of the upstream dam-passing channel (12) and both sides of a body section (6), the walking tracks (5) are provided with a bridge girder erection machine for transporting a ship reception chamber (8), the ship reception chamber (8) is transported to the bottom of the bridge girder erection machine by the transport platform (1), and the ship reception chamber (8) is hoisted to a ship reception chamber tooling platform (11) by the bridge girder erection machine. The construction method and device avoid measures of embedding electric blocks on walls of both sides of the body section and performing temporary wall reinforcement, meanwhile avoid relay transport in the air of longitudinal beams or horizontal beams of the ship reception chamber, reach the purposes of saving investment, saving construction period, and safe construction, and reduce the influence of the body section on the structure of a permanent building.

Description

technical field [0001] The invention relates to a construction method and device for hoisting heavy parts of a vertical ship lift, belonging to the technical field of water conservancy, hydropower and shipping. Background technique [0002] At present, vertical ship lifts are widely used in the field of water conservancy and hydropower. There are many difficulties in the implementation of the major components of the vertical ship lift, such as on-site splicing, transportation and hoisting of the ship's container, such as the narrow field of on-site assembly, The hoisting equipment cannot be arranged, and the design load of the traffic bridge is too small. Therefore, how to hoist and splice the main structure (such as longitudinal beams or beams) of the ship-bearing box in a narrow space is a problem that we need to solve urgently. At present, the hoisting scheme implemented in many projects is a combined hoisting scheme using the bridge machine of the ship lift itself and t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02C5/00
Inventor 张庆王洪军罗敏卢昆华翟张宏葛小博
Owner CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products