A trackless mining method for gently inclined ore veins using the out-of-vein chute ore extraction system as a ramp
A mining method and technology of ramps, which are applied in ground mining, mining equipment, earth-moving drilling, etc., can solve the problems of human and material resource consumption, long construction period, large mining accuracy, etc., and achieve reduced labor intensity, low labor intensity, The effect of large production capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0043] After the filling of the first section 101 is completed, personnel enter the rock drilling roadway B21 of the second section 102, and make a layer of 0.5m thick cemented surface 10 on the filling body 11; drive the trackless equipment into the stope from the section connecting cross-way A5 , carry out the mining operation; the recovery mode of the second subsection 102 and the third subsection 103 is the same as that of the first subsection 101; the ores of the upper two subsections pass through the respective downward subsection contact ramp A6, and the downward subsection contact ramp From B15 to section connecting horizontal alley A5, section connecting horizontal alley B14 and then transported to mine shaft A4 and mine shaft B18 for ore extraction, all ores are finally discharged through stage transportation lane 1; the filling material is lowered by filling the ventilation shaft 7 in the vein , mining and filling in sections from bottom to top. The specific impleme...
Embodiment
[0044] Embodiment: along the ore body 9, it is vertically divided into several stage ore blocks, and the length of each stage ore block is 40-60m, 25m high; then a single stage ore block is vertically divided into such as figure 1 In the first segment 101, the second segment 102 and the third segment 103 shown in three segments, the top of the third segment 103 is reserved with a top column 8, and the thickness of the top column 8 is 2.5m; as Figure 2-4 As shown, in the middle position of the side of the footwall of the ore block in the stage, parallel to the ore body 9, an in-vein filling ventilation shaft 7 is opened. The cross-section of the in-vein filling ventilation shaft 7 is a rectangle of 1.5m×2m. From the left to the right 2 / 3, a stage transportation lane 1 parallel to the stage ore block is dug out; from the middle position of the stage transportation lane 1 corresponding to the stage ore block direction, a horizontally arranged centralized ore discharge is excavate...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com