Method for external measurement of settlement of foundation of storage tank
A technology of storage tank foundation and measurement method, which is applied in the direction of measuring devices, instruments, optical devices, etc., to achieve good technical effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Various standards related to the settlement of the storage tank foundation have different requirements for the settlement. However, the specific requirements are the settlement difference between adjacent points (not greater than 10m) and between two points in the diameter direction upward of the foundation ring. Therefore, it is necessary to measure the coordinates of the tank foundation in the same coordinate system, so as to evaluate whether the foundation meets the requirements.
[0022] device installation
[0023] For specific measurements, such as figure 1 and figure 2 As shown, the tripod is placed in the upper left corner of the fire embankment, and the distance from the north and west wall dikes is about 2m. After the tripod stand is placed, fix the total station on the stand and level it. The recorder is connected to the total station via Bluetooth.
[0024] Transformation point placement
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Spacing | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com