An electromagnetic disturbance simulation test platform for the secondary system of a substation
A technology of electromagnetic disturbance and secondary system, applied in the direction of measuring electricity, measuring electrical variables, measuring devices, etc., can solve the problem of unclear influence of interference and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The invention provides an electromagnetic disturbance simulation test platform for the secondary system of a substation, which is combined below Figure 1-3 , to further explain the invention:
[0019] exist figure 1 The structure diagram of the electromagnetic disturbance simulation test platform for the secondary system of the substation and figure 2 In the schematic diagram of the secondary cable grounding and matching load connection in the electromagnetic disturbance simulation test platform of the secondary system of the substation shown, the specific structure of the electromagnetic disturbance simulation test platform of the secondary system of the substation is the first electromagnetic disturbance measurement system 8, the first simulation The sensor 1, the pot insulator 2, and the second analog sensor 3 are arranged at different positions on the casing of the GIS pipeline 4, and the casing of the GIS pipeline 4 is connected to the casing of the analog HSBC ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



