Fabrication method of formwork shear wall
A production method and shear wall technology, applied in the direction of walls, building materials, building components, etc., can solve the problems of low construction efficiency, a large amount of manpower, and high material prices, and achieve the goal of improving construction efficiency, speeding up construction progress, and simple operation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 , 3 , 4, 5, and 8, four vertical bars 1 arranged at rectangular corners are connected with the fixed rectangular stirrups 2 corners around them to form a steel bar cage, and the horizontal bars 4 hoops or welded on the steel bar On the cage, the formwork shear wall unit is formed. The reinforcement column cage in the formwork shear wall unit is connected to the steel mesh 3 through the connection member on the steel plate 7, and the connection member 6 between the reinforcement column cage and the steel plate 7 is a “Π”-shaped incision 10 on the steel plate, a “Π” shape Cutout 10 is turned over the connecting member 6 that the door type is bent down, as Figure 6 As shown, there is a U-shaped notch at the hanging end of the connecting member 6, and the U-shaped notch is snapped into and connected with the side of the vertical rib of the steel bar cage; 11, "I"-shaped cutout 11, the connecting member 5 that is bent in the door-to-door style on both si...
Embodiment 2
[0034] Such as figure 1 , 8 , shown in 9, four vertical ribs 1 arranged in rectangular corner positions are connected to a reinforcement column cage with 2 angles of rectangular stirrups surrounding and fixed around it, and 4 hoops of horizontal ribs or are welded on the reinforcement column cage to form Formwork shear wall elements. The reinforcement column cage in the formwork shear wall unit is connected with the steel mesh 3 through the V-shaped connecting member 12 and the U-shaped connecting member 13 on the connecting block 14, such as Figure 10 , 11 As shown, the steel mesh 3 is stuck into the V-shaped connector, and the V-shaped connector is folded and bent to form a through hole. The steel mesh 3 is firmly stuck in this through hole. The steel mesh 3 and the through hole can be welded again to strengthen Firmness; the steel column cage is snapped into the U-shaped connector, and the U-shaped connector is folded and bent in half to form a through hole, and the ver...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 