Generation method of power generation scheme to prevent sustained damage of hydropower station groups

A hydropower station group and continuous technology, applied in the direction of electrical digital data processing, instruments, calculations, etc., can solve the problems of no consideration of impact, lack of systematization of neural network structure parameters, cascade system abandonment of water, etc., and achieve the effect of accurate decision-making basis

Active Publication Date: 2017-04-12
WUHAN UNIV
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The problems in the current method are: ①The scheduling diagram can usually only be used for a single reservoir, and it is not convenient to deal with complex cascade reservoir group scheduling problems
②The determination of neural network structure parameters still lacks a systematic method, usually by trial and error, and the algorithm has the disadvantage of slow learning speed and easy to fall into local minimum
③When the water storage and supply discriminant method is used for dispatching, only the distribution of output is considered but not the distribution of water volume. It only focuses on the optimization within a time period, and does not consider the impact of operations in this time period on subsequent periods. Cascade system abandonment occurs. water is likely

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Generation method of power generation scheme to prevent sustained damage of hydropower station groups
  • Generation method of power generation scheme to prevent sustained damage of hydropower station groups
  • Generation method of power generation scheme to prevent sustained damage of hydropower station groups

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The invention considers the uncertainty of medium and long-term hydrological forecasting, adopts the method of energy to formulate the power generation restriction rules, and obtains the optimized power generation restriction rules through given target conditions and an optimization algorithm. This rule can fully consider the continuity and uniformity of power generation, aiming to avoid damage to the power generation process of the hydropower station group to the greatest extent, and provides a method for generating medium and long-term power generation schemes for the hydropower station group. See the specific process for details figure 1 .

[0038] A method for generating power generation schemes to prevent sustained damage to hydropower station groups, specifically including the following processes:

[0039] 1 Determine the optimization objectives and constraints, and establish the reservoir optimal dispatching model

[0040] 1.1 Determining the optimization objec...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A generation method of a power generation scheme for preventing sustained damage of a hydropower station group includes the steps of 1, determining an optimization target and constraint conditions and establishing a statin optimizing and scheduling module; 2, considering uncertainty of hydrological forecasting and conversion of forecasting runoff; 3, calculating potential output of each phase; 4, determining a pattern of power generation constraint rules; 5, acquiring optimized power generation constraint rules and a power generation scheme set by means of an optimization algorithm; and 6, establishing an evaluation index system to evaluate optimal scheduling results. The generation method has the advantages that sustainability of the power generation process is ensured, a minimum of damage is ensured, and the simple and universal power generation constraint scheduling rules are provided to guide optimization of hydropower stations; the influence of hydrological forecasting errors upon scheduling results is fully considered, the power generation constraint scheduling rules are optimized by means of forms of energy, and more accurate decision basis is provided for decision makers.

Description

technical field [0001] The invention relates to the technical field of reservoir dispatching, in particular to a method for generating reservoir dispatching plans aimed at ensuring the continuity of power generation and avoiding the continuity of power generation damage. Background technique [0002] The optimal dispatching of hydropower station groups redistributes water resources in time and space through the hydraulic power and storage capacity compensation of the reservoir group, so as to achieve the purpose of promoting benefits and eliminating harm. Usually, due to the uncertainty of runoff and uneven distribution within a year, the power generation of hydropower stations is often damaged to a certain extent (mainly reflected in the guaranteed rate of power generation of hydropower stations). At present, the scheduling rules used for the operation of hydropower stations (groups) usually include: reservoir scheduling diagrams, neural networks, discriminant methods, etc....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06F19/00
Inventor 郭生练李立平刘攀胡瑶杨光
Owner WUHAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products